Abstract: with the deepening of reform and opening up and in the rapid economic development, the city of further development speed, urban population is more and more, water and electricity demand more and more big, grasps the water supply and drainage and hvac project construction technology, completes the water supply and drainage and hvac project construction quality control are particularly important. In this paper a residential area of north of flow Ⅰ underground garage, for example, talk about how to do well water supply and drainage and hvac project construction quality control.

Keywords: water supply and drainage, hvac project, construction quality control

中圖分類號:O213.1 文獻(xiàn)標(biāo)識碼:A文章編號:

一、工程概況

本工程為Ⅰ類地下車庫,地下1層。內(nèi)設(shè)給排水及暖通工程:給排水工程包括(雨水系統(tǒng)、污水系統(tǒng)、地下室排水系統(tǒng)、消防栓系統(tǒng));暖通工程包括(送風(fēng)系統(tǒng)、排風(fēng)系統(tǒng))。給水系統(tǒng)用水來自城區(qū)自來水。排水系統(tǒng)污水采用合流方式排出,地下室廢水及消防電梯底部廢水采用潛水泵提升排出。消防系統(tǒng)分兩個(gè)區(qū)上下成環(huán)行。通風(fēng)系統(tǒng)合用前室設(shè)有機(jī)械加壓送風(fēng)系統(tǒng)。樓梯間設(shè)置機(jī)械加壓送風(fēng)系統(tǒng)。室內(nèi)設(shè)機(jī)械送風(fēng)及機(jī)械排風(fēng)。

二、 施工準(zhǔn)備工作

1、認(rèn)真熟悉圖紙,及早發(fā)現(xiàn)問題,尤其要分析各專業(yè)施工工序安排是否存在矛盾。

2、統(tǒng)計(jì)預(yù)埋件,預(yù)留孔洞個(gè)數(shù),繪制預(yù)留洞詳圖。管道穿越地下室外墻,水池壁,一律預(yù)埋鋼性防水套管,穿越剪力墻時(shí),均應(yīng)按要求預(yù)留孔洞。

3、施工時(shí)需與土建專業(yè)密切配合,掌握好建筑的坐標(biāo)位置,加強(qiáng)對預(yù)留孔洞、套管以及預(yù)埋件的預(yù)檢、隱檢的檢查力度,避免位置錯(cuò)誤或套管漏失,在澆注混凝土?xí)r,應(yīng)派專人配合校對,看管埋件、套管,以免移位。

三、安裝與調(diào)試階段

由于工程結(jié)構(gòu)、給排水、電氣、暖通等專業(yè)交叉施工,故合理安排專業(yè)施工程序,解決各專業(yè)和專業(yè)工種在時(shí)間上的搭接施工,對縮短工期,提高施工質(zhì)量,保證安全生產(chǎn)非常重要。

1、配合原則

給水管道讓排水管道、風(fēng)管、其他給水管道、熱水管道、回水消防管道交叉時(shí)、管徑小的自行煨彎讓管徑大、壓力管道讓非壓力管道,各工種基本上要本著小管讓大管的原則,合理布置、確定和調(diào)整本工程管道走向及支架位置。

2、設(shè)備安裝與土建配合

設(shè)備定貨時(shí)應(yīng)及時(shí)核實(shí)混凝土基礎(chǔ),及時(shí)進(jìn)行澆筑,到貨后及時(shí)就位,為管道配管及電氣接線創(chuàng)造條件。在安裝工程施工中,機(jī)房的安裝是非常重要的一部分。在機(jī)房及設(shè)備層內(nèi)分布著各種各樣的設(shè)備、風(fēng)管、水管、電氣管,在施工過程中,既要保證圖紙的順利實(shí)行,同時(shí)還要保證各種管道不會打架;而且機(jī)房的噪音、積水等又對土建結(jié)構(gòu)的嚴(yán)密性、防水性有較高要求。在以往的施工過程中,常常因?yàn)橥两ㄅc各個(gè)專業(yè)配合不當(dāng),造成機(jī)房施工延誤工期或質(zhì)量不符合要求。為避免產(chǎn)生不利情況,制定交叉作業(yè)措施。各個(gè)階段均應(yīng)遵循施工驗(yàn)收規(guī)范和質(zhì)量工藝標(biāo)準(zhǔn),上一道工序不符合要求的,下一道工序有權(quán)拒絕繼續(xù)施工。

3、交叉節(jié)點(diǎn)施工

在管井、管廊、設(shè)備機(jī)房等部位各專業(yè)管線繁多、交叉重疊,如事先不進(jìn)行有效的協(xié)調(diào),容易產(chǎn)生相互干擾和影響的情況,造成工程整體施工進(jìn)度和質(zhì)量出現(xiàn)問題。因此,對交叉節(jié)點(diǎn)處的施工,事先進(jìn)行各種管線空間布置上的協(xié)調(diào)。在綜合圖的基礎(chǔ)上進(jìn)行支架的協(xié)調(diào)。在保證不影響后序施工的前提下,各專業(yè)可在不同的區(qū)域進(jìn)行同時(shí)施工,以縮短工期。采取以上措施,即可避免出現(xiàn)影響工程施工進(jìn)度和質(zhì)量的問題,并且在工程觀感上有很好的效果,對工程評定有很大幫助。

4、與裝修工程配合

(1)、施工中將服從裝飾工程需要,凡是影響裝飾效果的修改,將予以隨時(shí)配合。

(2)、在施工中,對在飾面上安裝的器件(如燈具、開關(guān)、插座),參照相應(yīng)部位裝修圖進(jìn)行定位,避免日后不必要的修改或破壞,進(jìn)而影響整體的裝飾效果。

(3)、在配合施工時(shí),及時(shí)了解墻面與樓板的進(jìn)度,把有關(guān)工作量按時(shí)安裝完畢,不影響裝飾進(jìn)度和避免造成二次破壞。

(4)、分區(qū)進(jìn)行裝修、安裝工程的交叉施工工序,規(guī)定工序交接的順序和方法。

四、施工工序及主要施工工藝標(biāo)準(zhǔn)

(一)、給排水工程

1、基本工藝流程:

2、材料及接口方式

(1)給水管道采用鋼襯塑管,絲口或卡箍連接。

(2)排水管道采用機(jī)制柔性鑄鐵管,法蘭連接。

(3)雨水管道,潛污泵提升管道采用焊接鋼管。

(4)地下室重力排水管道采用加厚焊接鋼管。

(5)消防管道采用鍍鋅鋼管。絲口或卡箍連接。

3、柔性鑄鐵管道安裝

(1)材料及管件等有相應(yīng)的產(chǎn)品合格證;管材及管件內(nèi)外壁光滑,無沙眼、氣孔等缺陷。

(2)管道安裝時(shí)按照系統(tǒng)的設(shè)計(jì)位置,結(jié)合設(shè)備的排水口施工要求,在墻柱和樓板面上劃出管道中心線并確定排水管道預(yù)留管口坐標(biāo),做出標(biāo)記。

(3)管道連接時(shí)插口與橡膠圈擦拭干凈,確保結(jié)合緊密。

(4)柔性鑄鐵管安裝完畢應(yīng)對每層的排水管道進(jìn)行相應(yīng)的灌水試驗(yàn),室內(nèi)地漏采用不銹鋼或塑料制品,嚴(yán)禁采用鑄鐵地漏。

4、管道安裝

(1)給水管道安裝時(shí),一般從總進(jìn)口開始操作,安裝完后找直找正,復(fù)合甩口方向及位置是否有誤。

(2)立管固定卡件以樓層高度為準(zhǔn)

(3)管道的橫管坡度在設(shè)計(jì)沒有時(shí),壓力管道不小于0.002、自流管道不小于0.02。

(二)采暖系統(tǒng)

采暖管道采用鍍鋅鋼管、鉸鏈鋁塑管。鍍鋅鋼管采用絲口及卡箍連接,鋁塑管采用專用管件連接。

(1)干管及立管安裝要按照設(shè)計(jì)要求做好坐標(biāo)、標(biāo)高、坡向、坡度,設(shè)計(jì)未明確時(shí)應(yīng)按照不小于0.2%敷設(shè),在最高點(diǎn)和最低點(diǎn)分別設(shè)置排氣閥和泄水裝置。

篇2

關(guān)鍵詞:教材;高職高專;《建筑給水排水工程》;修訂

中圖分類號:G642 文獻(xiàn)標(biāo)志碼:A 文章編號:1673-291X(2010)10-0227-02

收稿日期:2009-12-28

作者簡介: 李敬苗(1978-),女,河北保定人,講師,碩士研究生,從事給排水管道、水污染控制、高職教學(xué)改革研究。

教材是高等教育教學(xué)過程中的三大要素之一,是知識傳播的載體,是進(jìn)行教學(xué)的基本工具,是維護(hù)教學(xué)秩序穩(wěn)定的基本環(huán)節(jié),也是體現(xiàn)教育方針、教育目標(biāo)和教育成果的主要形式,更是深化教學(xué)改革、提高教學(xué)質(zhì)量的重要保證。因此,教材對培養(yǎng)高素質(zhì)的人才發(fā)揮著十分重要的作用。

本人從事過多年室內(nèi)外管道工程的設(shè)計(jì)工作及多年的教學(xué)工作,所以根據(jù)自己的經(jīng)驗(yàn),分析現(xiàn)有教材的特點(diǎn)和缺點(diǎn),對高職高?!督ㄖo水排水工程》教材的修訂提幾點(diǎn)想法和建議。

一、《建筑給水排水工程》課程的特點(diǎn)

(一)《建筑給水排水工程》課程特點(diǎn)

1.與其他專業(yè)課程的不同之處?!督ㄖo水排水工程》主要教學(xué)內(nèi)容包括建筑內(nèi)部和居住小區(qū)的給水、排水、熱水供應(yīng)和與之密切聯(lián)系的消防給水,水景、游泳池給水排水,建筑中水的設(shè)計(jì)原理、設(shè)計(jì)方法以及安裝和管理等方面的基本知識和技術(shù)。從它的教學(xué)內(nèi)容可以看出來,這門課程與其他相關(guān)課程如《給水工程》、《排水工程》、《給排水管道工程》等,是有很大區(qū)別的。因?yàn)椤督o水工程》側(cè)重于給水處理工藝和市政給水管網(wǎng)設(shè)計(jì),《排水工程》側(cè)重于污水治理技術(shù)和市政排水管網(wǎng)設(shè)計(jì)。所以,《建筑給水排水工程》目標(biāo)比較單一,強(qiáng)調(diào)實(shí)用性和實(shí)踐性,對基礎(chǔ)理論要求較低。

2.與其他專業(yè)課程的聯(lián)系。我們知道,一棟建筑物如果想正常發(fā)揮其使用功能,需要水、電、暖等各種建筑設(shè)備共同協(xié)調(diào)、共同工作,而《建筑給水排水工程》正是講述建筑內(nèi)部給水排水的,所以它構(gòu)成了建筑設(shè)備工程中很重要的一部分,同時(shí)與其他部分又密不可分。所以,這門課程與電氣、暖通空調(diào)和燃?xì)獾绕渌嚓P(guān)專業(yè)課程有密切的聯(lián)系。同時(shí),與《給水工程》和《排水工程》等課程在知識上相互銜接、互相呼應(yīng)。

(二)高職高?!督ㄖo水排水工程》課程特點(diǎn)

1.高職高?!督ㄖo水排水工程》開設(shè)情況概述?!督ㄖo水排水工程》原來只是在本科院校的給水排水專業(yè)和建筑設(shè)備等專業(yè)開設(shè),近些年來,有一些專科學(xué)校和高職院校也開設(shè)了給水排水專業(yè)、建筑設(shè)備專業(yè)、水務(wù)工程專業(yè)、物業(yè)管理專業(yè)等相關(guān)專業(yè),這些專業(yè)也都開設(shè)《建筑給水排水工程》這門課程。

2.高職高?!督ㄖo水排水工程》的特點(diǎn)。教材是為教學(xué)目的服務(wù)的,高等職業(yè)技術(shù)教育與普通高等教育的辦學(xué)目的和定位不一樣,高等職業(yè)教學(xué)主要任務(wù)是培養(yǎng)應(yīng)用型人才,將科學(xué)技術(shù)轉(zhuǎn)化為生產(chǎn)力。所以,高職高專的《建筑給水排水工程》和一般本科院校的《建筑給水排水工程》教材應(yīng)該是有區(qū)別的,而且隨著時(shí)間的推移,教材的內(nèi)容應(yīng)該是與時(shí)俱進(jìn)的。一些舊的教材由于與我們高職高專專業(yè)的培養(yǎng)目標(biāo)不匹配,已經(jīng)嚴(yán)重影響到了我們授課的效果,相應(yīng)也影響到了學(xué)生對知識的理解和吸收,影響到了學(xué)生的就業(yè)。目前,中國高職教育發(fā)展得越來越快,有更多的高職院校和更多的相關(guān)專業(yè)不斷產(chǎn)生,對高職高?!督ㄖo水排水工程》教材的需要也越來越迫切。所以,我們很有必要編寫適合我們高職高專院校學(xué)生的教材。

二、高職高專《建筑給水排水工程》教材存在的問題及修訂的建議

1.目前,高職高?!督ㄖo水排水工程》數(shù)量很少。據(jù)筆者調(diào)查,目前市場上高職高?!督ㄖo水排水工程》教材非常少,只有有數(shù)的幾部。其中包括,1997年中國建筑工業(yè)出版社出版的由邵林廣主編的高職高?!督ㄖo水排水工程》;2004年重慶大學(xué)出版社出版的由嘉輝主編的高職高?!督ㄖo水排水工程》和2006年科學(xué)出版社出版的李平、鄧愛華主編的高職高?!督ㄖo水排水工程》等??梢娊滩牡臄?shù)量是很少的,這樣不利于我們在選教材的過程中更好的比較,優(yōu)勝劣汰。而且,我們從教材的出版年限可以看出來,有的教材出版年限已經(jīng)很久了,所以里邊一定有過時(shí)的、不符合現(xiàn)在技術(shù)發(fā)展要求的內(nèi)容。所以,我們必須根據(jù)教學(xué)的需要,根據(jù)社會、經(jīng)濟(jì)技術(shù)發(fā)展的需要,對建筑給水排水教材進(jìn)行修訂,使之更好地為我們的高職高專學(xué)生和教師服務(wù),更好地為社會服務(wù)。

2.建議刪減理論內(nèi)容,增加實(shí)踐內(nèi)容 [1]。傳統(tǒng)《建筑給水排水工程》教材側(cè)重于室內(nèi)給排水的計(jì)算、設(shè)計(jì)和基礎(chǔ)理論的講授,實(shí)踐內(nèi)容較少,而且理論內(nèi)容繁雜,所以需要很長的課時(shí)才能講授完。而高職高專的《建筑給水排水工程》根據(jù)高職高專以就業(yè)為導(dǎo)向的教學(xué)目標(biāo),應(yīng)該簡化理論及公式推導(dǎo)的內(nèi)容,主要側(cè)重于實(shí)踐教學(xué),使學(xué)生理論知識夠用,實(shí)踐知識扎實(shí)豐富,這樣更容易進(jìn)入工作狀態(tài),更快實(shí)現(xiàn)角色(從學(xué)生到工作人員)的轉(zhuǎn)換。

3.建議各章例題要前后連貫,互相呼應(yīng) [2]。《建筑給水排水工程》每一章都有計(jì)算實(shí)例,但大部分的教材各章的例題都是單設(shè)的,前后不連貫的。我認(rèn)為,修訂教材的時(shí)候,最好把各章的計(jì)算例題統(tǒng)一,這樣既有利于加深學(xué)生理解,又有利于學(xué)生識圖。例如:同一棟教學(xué)樓,既需要給水系統(tǒng),又需要排水系統(tǒng),還需要消防系統(tǒng),因此,我們可以在建筑給水系統(tǒng)、建筑排水系統(tǒng)、建筑消防系統(tǒng)三個(gè)章節(jié)里邊以同一棟教學(xué)樓為例,分別進(jìn)行給水、排水、消防管道的設(shè)計(jì)計(jì)算,這樣幾章節(jié)下來,一棟建筑物的一整套給排水計(jì)算就完成了,最后再統(tǒng)一復(fù)習(xí)一下,學(xué)生一定會對例題有更深刻更完整的理解。

4.建議課本中附加一套簡單的實(shí)際給排水工程圖紙。高職高專學(xué)生畢業(yè)后大部分出路是參加工作,而與這門課程相關(guān)的工作就是工程安裝、工程概預(yù)算、工程監(jiān)理等工作。要做這些工作,主要不是需要學(xué)生掌握太多的設(shè)計(jì)知識,而是要掌握扎實(shí)的識圖知識和實(shí)踐技能,所以本人認(rèn)為課本附錄中附帶一套簡單的工程設(shè)計(jì)圖紙是非常有必要的,可以讓學(xué)生對施工圖有完整的、直觀的認(rèn)識。

因?yàn)槲覀兒枚嗳握n老師是畢業(yè)后直接從事教學(xué)工作的,所以老師自己對真正的工程圖紙都不太懂,甚至根本就沒見到過。因此,如果課本中沒有這一項(xiàng)內(nèi)容,老師便不可能教懂學(xué)生。而如果我們在課本中附加了圖紙,我們的學(xué)生在學(xué)完基礎(chǔ)理論后,便能利用基礎(chǔ)理論進(jìn)行識圖。能看懂和識別真正的工程圖紙是將來從事管道施工、給排水概預(yù)算、給排水監(jiān)理和給排水設(shè)計(jì)等方面的工作所必須具備的一項(xiàng)實(shí)踐技能。所以,從就業(yè)方面來考慮,在課本中附加一套簡單的給排水工程圖紙是很有必要的。

5.建議每章增加課后習(xí)題,包括理論和實(shí)踐習(xí)題。因?yàn)楹枚嗟摹督ㄖo水排水工程》教材(包括高職高專的和非高職高專的)都沒有課后習(xí)題,所以筆者提出了這條建議。課后習(xí)題是非常有必要的,可以在每節(jié)或每章內(nèi)容講完后及時(shí)對所學(xué)的內(nèi)容進(jìn)行鞏固、加深理解。雖然我們這門課程,強(qiáng)調(diào)實(shí)踐,但基礎(chǔ)理論還是需要掌握的。德國心理學(xué)家艾賓浩斯研究發(fā)現(xiàn),遺忘在學(xué)習(xí)之后立即開始,最初遺忘速度很快,以后逐漸緩慢。有人進(jìn)一步研究得出:遺忘速度最快的區(qū)段是學(xué)習(xí)后的20分鐘、1小時(shí)、24小時(shí),分別遺忘42%、56%、66%;2~31天遺忘率穩(wěn)定在72%~79%之間。顯而易見,復(fù)習(xí)的最佳時(shí)間是學(xué)習(xí)后的1~24小時(shí),最晚不超過兩天,在這個(gè)區(qū)段內(nèi)稍加復(fù)習(xí)即可恢復(fù)記憶。過了這個(gè)區(qū)段因已遺忘了材料的72%以上,所以復(fù)習(xí)起來就“事倍功半”。根據(jù)這個(gè)研究結(jié)果,沒有習(xí)題,學(xué)生學(xué)完后沒有及時(shí)鞏固的過程,學(xué)的東西很快就忘記了。所以,根據(jù)每章的內(nèi)容制定合理的理論和實(shí)踐習(xí)題是很有必要的。

6.課本內(nèi)容要跟上相關(guān)規(guī)范和圖籍的修改,要跟上經(jīng)濟(jì)技術(shù)的發(fā)展。首先,《建筑給水排水工程》不管是設(shè)計(jì)還是施工,都會用到規(guī)范――設(shè)計(jì)和施工規(guī)范及各種圖籍,而設(shè)計(jì)規(guī)范和圖籍,不是一成不變的東西,是隨著社會發(fā)展和技術(shù)進(jìn)步逐漸更新的。以建筑給水排水設(shè)計(jì)規(guī)范為例,從《室內(nèi)給水排水和熱水供應(yīng)設(shè)計(jì)規(guī)范》TJ15-74 到《建筑給排水設(shè)計(jì)規(guī)范》GBJ15-88再到《建筑給水排水設(shè)計(jì)規(guī)范》GB50015-2003,已經(jīng)經(jīng)歷了多次修訂,每次修訂都會有新的內(nèi)容加入,也會有過時(shí)內(nèi)容的剔除,甚至某些內(nèi)容會發(fā)生很大改變。

例如對于居住建筑室內(nèi)給水設(shè)計(jì)秒流量的計(jì)算:

在《室內(nèi)給水排水和熱水供應(yīng)設(shè)計(jì)規(guī)范》TJ15-74中用式(1)

qg=0.2Nαg+KNg(1)

在《建筑給排水設(shè)計(jì)規(guī)范》GBJ15-88中改為式(2)

qg=0.2α(根號下Ng)+KNg (2)

公式(1)和(2)都叫做平方根法,到《建筑給水排水設(shè)計(jì)規(guī)范》GB50015-2003中,我們采用了和前二者完全不同的概率法進(jìn)行計(jì)算。其次,《建筑給水排水工程》中我們會用到管材和一些設(shè)備。而這些管材和設(shè)備是隨著社會發(fā)展、技術(shù)進(jìn)步逐步改進(jìn)的。例如,給水管道的材料,解放初期主要用灰口鑄鐵管和鋼管;20世紀(jì)60年代我們開發(fā)了自應(yīng)力和預(yù)應(yīng)力混凝土管;改革開放以來,我們又開發(fā)引進(jìn)了球墨鑄鐵管,在很大程度上替代了灰口鑄鐵管和鋼管;現(xiàn)在應(yīng)節(jié)約資源和保護(hù)環(huán)境的需要,國家建設(shè)部要求管材選用逐步向化學(xué)管材轉(zhuǎn)變,包括PVC-U、PE、玻璃鋼管、塑料金屬復(fù)合管、PP-R管等,逐步限制淘汰鍍鋅鋼管和傳統(tǒng)鑄鐵管。從2000年開始,新建小區(qū)內(nèi)戶外給水管必須使用塑料管,城市新建供水管工程應(yīng)優(yōu)先選用管徑400mm以下的塑料管,到2005年,塑料管道在全國各類管道中市場占有率達(dá)到50%以上。所以,隨著技術(shù)進(jìn)步和政策的傾向性不同,我們在給水管道材料的選擇上是有很大區(qū)別的。同樣,對于排水管道的材料及水泵、水箱等設(shè)備及各種閥門的選擇,也會隨著技術(shù)的進(jìn)步和其他條件的變化而有很大不同。所以,我們的教材就要根據(jù)規(guī)范和圖籍的變化、根據(jù)其他各相關(guān)方面的變化及時(shí)進(jìn)行修訂,否則就會與社會脫節(jié),與市場脫節(jié)。

7.課后附錄內(nèi)容一定要齊全。建筑給水排水教材中的附錄內(nèi)容包括很多,例如:各種管材的給排水流量和水力計(jì)算表、水表等設(shè)備的參數(shù)表等。因?yàn)閮?nèi)容太多,不可能都附在教材中,但必要的內(nèi)容一定要有。例如,有的教材就存在這樣的問題:建筑給水系統(tǒng)章節(jié)中室內(nèi)給水管網(wǎng)計(jì)算的例題中,選擇的管材是塑料管材UPVC或PPR,但附錄里邊卻沒有這兩種管材的水力計(jì)算表,所以造成了學(xué)生進(jìn)行水力計(jì)算時(shí),沒有對應(yīng)的水力計(jì)算表查閱,因此理解例題有困難,所以我認(rèn)為修訂和編撰教材一定要前后呼應(yīng)、前后連貫。

綜上所述,現(xiàn)有高職高?!督ㄖo水排水工程》教材存在的問題很多,作者只是根據(jù)自己的經(jīng)驗(yàn)列舉了幾條,希望能夠應(yīng)用到教材修訂實(shí)踐當(dāng)中去,作出適合高職高專使用的優(yōu)秀的教材。

參考文獻(xiàn):

篇3

關(guān)鍵詞:給水排水;設(shè)計(jì);問題;方法

建筑在建設(shè)的過程中,給水和排水工程的建設(shè)是重點(diǎn),社會在不斷的發(fā)展,建筑工程的質(zhì)量得到了很大的提升,人們對于建筑功能的要求也越來越高,很多廚衛(wèi)等設(shè)施隨著功能的齊全,其復(fù)雜程度也越來越高,這給給水和排水工程的設(shè)計(jì)帶來一定的困難.因此,相關(guān)的設(shè)計(jì)人員應(yīng)該針對這些現(xiàn)狀,制定出相應(yīng)的方法,提高給水和排水工程的質(zhì)量,為人們的生活提供更多的便利.

1建筑給水和排水設(shè)計(jì)中存在的問題

1.1整體思想的缺乏

現(xiàn)在建筑施工中,在對給水和排水工程設(shè)計(jì)中,還是存在一定的問題的,隨著給水系統(tǒng)越來越復(fù)雜,人們對于建筑功能的要求也越來越高,在對建筑給水和排水工程進(jìn)行設(shè)計(jì)的過程中,就必須完善思想,進(jìn)行全面的布局,但是,從現(xiàn)在給水和排水工程的設(shè)計(jì)情況分析,在設(shè)計(jì)中,只是針對局部的設(shè)施,沒有站在整體的角度去思考問題,這就導(dǎo)致了給水和排水設(shè)施在局部存在不完善的地方.例如,在對建筑中的衛(wèi)生間的給水和排水管道進(jìn)行設(shè)計(jì)時(shí),沒有完善整體的理念,導(dǎo)致了給水和排水設(shè)施在安裝后出現(xiàn)了布局問題,在設(shè)計(jì)中缺乏合理性,導(dǎo)致設(shè)計(jì)的美觀度下降,而且還會導(dǎo)致資源的嚴(yán)重浪費(fèi)問題,使給水和排水設(shè)施在安裝的過程中的成本上升,使企業(yè)的經(jīng)濟(jì)效益嚴(yán)重下降[1].在對廚房的給水和排水設(shè)施進(jìn)行設(shè)計(jì)時(shí),如果沒有樹立全局的觀念,就會導(dǎo)致很多系統(tǒng)不能協(xié)調(diào)使用,給水和排水系統(tǒng)與建筑的整體結(jié)構(gòu)不能協(xié)調(diào)一致,給水和排水系統(tǒng)與暖通系統(tǒng)和電氣系統(tǒng)出現(xiàn)沖突,而且,在對給水和排水設(shè)施進(jìn)行設(shè)計(jì)的過程中,由于設(shè)計(jì)單位不能站在全局的角度去設(shè)計(jì),在安裝后,給水和排水設(shè)計(jì)與其他的系統(tǒng)不能結(jié)合使用.現(xiàn)在,給水和排水系統(tǒng)越來越復(fù)雜,人們對室內(nèi)的美觀度要求越來越高,在給水和排水設(shè)施設(shè)計(jì)的過程中,樹立整體思想就十分的重要.因此,對于這些問題,在建筑給水和排水設(shè)施設(shè)計(jì)中,一定要分析各個(gè)系統(tǒng)的要素,然后站在全局的角度去設(shè)計(jì),使給水和排水系統(tǒng)能夠更加合理的應(yīng)用.

1.2可靠性過低

可靠性比較差使給水和排水系統(tǒng)設(shè)計(jì)中一個(gè)比較普遍的問題,在建筑給水排水系統(tǒng)使用的過程中,不能顧達(dá)到預(yù)期的目標(biāo),不能夠保證系統(tǒng)在長時(shí)間的使用中還保持良好的性能,而且不出現(xiàn)任何的故障.現(xiàn)在,給水和排水系統(tǒng)出現(xiàn)故障的原因,很大程度上是由設(shè)計(jì)的不合理造成的,在設(shè)計(jì)的過程中,對可靠性因素考慮不足,在對建筑給水和排水系統(tǒng)進(jìn)行施工中,出現(xiàn)的一個(gè)嚴(yán)重的問題就是給水和排水系統(tǒng)的可靠性比較差,在給水和排水系統(tǒng)使用的過程中,容易出現(xiàn)很多的故障,導(dǎo)致了建筑內(nèi)部出現(xiàn)積水等問題.這些故障產(chǎn)生的原因無非就是在設(shè)計(jì)中,各個(gè)布局不能合理的安排,導(dǎo)致了系統(tǒng)不能正常的使用,在設(shè)計(jì)中不能進(jìn)行可靠性分析,或者在設(shè)計(jì)中過分的考慮成本因素,很多商家不得不犧牲質(zhì)量來降低成本,導(dǎo)致給水和排水系統(tǒng)的可靠性下降.在給水和排水系統(tǒng)設(shè)計(jì)中,出現(xiàn)了各類技術(shù)問題,如材料的質(zhì)量低下,在對管道的選擇中,沒有按照相關(guān)的標(biāo)準(zhǔn)進(jìn)行,不能選擇優(yōu)質(zhì)的構(gòu)件,造成安全隱患在進(jìn)行施工中,不能提前檢查材料,將那些不合格的材料投入到施工中,而且,材料在檢測的過程中沒有制定相關(guān)的標(biāo)準(zhǔn),材料在選擇的過程中沒有按照嚴(yán)格的流程審核,導(dǎo)致了不合格的材料使用.在給水和排水系統(tǒng)設(shè)計(jì)中,對其結(jié)構(gòu)的設(shè)計(jì)存在不合理的方面,沒有提前對系統(tǒng)的可靠性進(jìn)行評估就投入使用,一些在結(jié)構(gòu)方面存在問題的系統(tǒng)也投入到日常的使用中,導(dǎo)致各個(gè)指標(biāo)都不能聯(lián)系,使給水和排水系統(tǒng)不能進(jìn)行最合理的設(shè)計(jì).結(jié)構(gòu)在設(shè)計(jì)的過程中存在很大的問題,如在使用的過程中,沒有對可靠性指標(biāo)運(yùn)用統(tǒng)一的評估進(jìn)行評測,設(shè)計(jì)也不能得到優(yōu)化[2].

1.3管道的布置和敷設(shè)存在問題

現(xiàn)在,建筑的類型越來越多,不同類型的建筑在設(shè)計(jì)給水和排水系統(tǒng)時(shí)的管道布置方法是不同的,管道在布置的過程中,要遵循自身的特點(diǎn),不能盲目的敷設(shè).應(yīng)該在相應(yīng)的建筑下層,通過分析建筑架空的情況,在轉(zhuǎn)換排水管的時(shí)候,一定要運(yùn)用底部轉(zhuǎn)換的方法,而且要按照相關(guān)的標(biāo)準(zhǔn)轉(zhuǎn)換,排水的使用用戶不能太多,不能超過100戶.然而,在實(shí)際的設(shè)計(jì)中,給水和排水管道的布置卻受到了很多因素的制約,在施工的過程中,不能按照相關(guān)的標(biāo)準(zhǔn)進(jìn)行,排水管的使用客戶過多,導(dǎo)致排水管道內(nèi)的壓力過大,太大的壓力會導(dǎo)致排水管道直接漲裂,帶來很大的安全隱患.在相當(dāng)多的建筑中,在對給水和排水管道設(shè)計(jì)時(shí),衛(wèi)生間的管道應(yīng)該與其他的管道是分離的,因?yàn)樾l(wèi)生間對管道的使用頻率是比較高的,而且,底層的衛(wèi)生器具的排水管道應(yīng)該與排水立管連接在一起,但是,在實(shí)際的施工中,設(shè)計(jì)卻不能按照這種方式進(jìn)行,很多施工企業(yè)都認(rèn)為這樣設(shè)計(jì)的成本過高,他們?yōu)榱私档褪┕ぶ械某杀荆蛯⑿l(wèi)生器具的排水管道與立管分離,甚至出現(xiàn)了隨意安裝的問題,而且底層的衛(wèi)生器具與排水立管的距離比較大,會出現(xiàn)污水滲漏的問題[3].

1.4給水和排水系統(tǒng)設(shè)計(jì)中管道材料問題

施工單位在進(jìn)行給水和排水管道設(shè)計(jì)的過程中,他們一般都會采用冷鍍鋅鋼管,這種材料會導(dǎo)致水污染問題,所以,現(xiàn)在一般都使用復(fù)合的不銹鋼材料制造管材,但是,這類管材的成本比較高,而且其保溫性能不是很好,導(dǎo)致了給水和排水管道還是不能合理的使用.

1.5管道的噪聲污染

給水和排水管道在設(shè)計(jì)中還是會存在嚴(yán)重的噪聲污染,在對供熱系統(tǒng)進(jìn)行供水的過程中,容易出現(xiàn)大量的氣體,這些氣體會沖撞管道,產(chǎn)生很大的噪音,而且水流和管道之間也會產(chǎn)生噪音.而且,水流在管道的內(nèi)部容易受到流速的影響,如果流速過大,就會導(dǎo)致水流和管道之間的沖擊力增大,導(dǎo)致管道的噪音,導(dǎo)致居民生活受到影響[4].

1.6二次供水污染

在給水和排水管道中使用的材料一般是鋼鐵或者鑄鐵,這些材料在遇到水后容易生銹,這些由生銹產(chǎn)生的污漬會導(dǎo)致管道的堵塞,減少了水流的通行面積,導(dǎo)致管道內(nèi)的水質(zhì)被污染.在一些新型的管道中,也會出現(xiàn)供水的污染問題,即使是在塑料的管道中,也會出現(xiàn)水質(zhì)的污染,大量的水流會導(dǎo)致塑料直接溶解,產(chǎn)生的化學(xué)物質(zhì)直接對水資源造成污染.現(xiàn)在,城市供水一般采用的是氣壓的方式,這種方式會導(dǎo)致能耗的上升,而且水壓是不容易調(diào)節(jié)的,水箱的清理工作變得日常的復(fù)雜,導(dǎo)致供水的污染.

1.7地漏設(shè)計(jì)存在問題

施工單位在對地漏施工的過程中,為了能夠節(jié)省成本,他們對選擇一些質(zhì)量不是很高的地漏,這些地漏在封水的過程中,其深度不夠,而且很容易產(chǎn)生細(xì)菌.而且,很多施工單位不能按照規(guī)定設(shè)計(jì),出現(xiàn)了水災(zāi)的情況,他們直接將地漏堵死,地漏不能合理的應(yīng)用.

2做好建筑給水和排水系統(tǒng)設(shè)計(jì)的方法

2.1做好施工的整合工作

在對建筑給水和排水系統(tǒng)設(shè)計(jì)的過程中,應(yīng)該通過對工程的整合,站在全局的角度去思考問題,通過分析不同類型的建筑的特征,做好給水和排水系統(tǒng)的設(shè)計(jì),要在一定的標(biāo)準(zhǔn)的前提下設(shè)計(jì),減少管道使用的數(shù)量,降低成本.在對建筑給水和排水系統(tǒng)設(shè)計(jì)的過程中,應(yīng)該分析暖通工程以及其他電氣系統(tǒng)的結(jié)構(gòu),把握好給水和排水系統(tǒng)的結(jié)構(gòu),從而能夠使各個(gè)系統(tǒng)都能夠發(fā)揮作用,而且能夠保持室內(nèi)的美觀度[5].因此,給水和排水系統(tǒng)的設(shè)計(jì)人員應(yīng)該具有全面分析的能力,具備一定的專業(yè)知識,了解建筑物特點(diǎn)的基礎(chǔ)上,對系統(tǒng)的設(shè)計(jì)進(jìn)行整體的分析,從而能夠使各個(gè)系統(tǒng)有效的結(jié)合.在對整個(gè)系統(tǒng)進(jìn)行整合分析的基礎(chǔ)上,應(yīng)該堅(jiān)持服務(wù)為主的思想,確保設(shè)計(jì)能夠讓用戶用起來比較舒適,而且確保設(shè)計(jì)的合理性,保證各個(gè)系統(tǒng)之間有效的銜接,能夠進(jìn)行相互的改造,使設(shè)計(jì)的效果得到提升.在設(shè)計(jì)給水和排水系統(tǒng)時(shí),要確保建筑結(jié)構(gòu)的合理性和美觀度,而且能夠?yàn)槿藗兲峁┍憷?

2.2完善設(shè)計(jì)的可靠性

在對建筑進(jìn)行設(shè)計(jì)中,可靠性是最重要的,所以,在對建筑給水和排水系統(tǒng)進(jìn)行設(shè)計(jì)的過程中,應(yīng)該做好可靠性的評估工作,現(xiàn)在,在對可靠性進(jìn)行評價(jià)的過程中,還是存在一定的問題的,要對評估的過程中進(jìn)行完善,要對管道的材料進(jìn)行合理的選擇,選擇那些可靠的商家,選擇性價(jià)比高的材料,防止那些劣質(zhì)的材料投入到施工中,在對施工構(gòu)件選擇的過程中,也應(yīng)該格外的注意,按照相關(guān)的規(guī)范和標(biāo)準(zhǔn)選擇,設(shè)計(jì)人員首先應(yīng)該了解建筑物的主要特征,在此基礎(chǔ)上,制定出合適的材料選擇的方案,防止僅僅因?yàn)槌杀締栴}而忽視了質(zhì)量問題,選擇一些不適合建筑的材料[6].在對給水和排水系統(tǒng)進(jìn)行設(shè)計(jì)的過程中,要注重結(jié)構(gòu)的設(shè)計(jì),在設(shè)計(jì)中如果是存在缺陷的,要分析是否存在安全隱患,針對這些安全隱患采取措施,從而完善建筑給水和排水設(shè)計(jì)的可靠性.在對建筑給水和排水系統(tǒng)進(jìn)行設(shè)計(jì)中,要運(yùn)用新的技術(shù),提高設(shè)計(jì)的技術(shù)含量,采用新的理念,同時(shí)要運(yùn)用新的材料,在實(shí)際的施工中也要創(chuàng)新,提高系統(tǒng)的使用性能,節(jié)省系統(tǒng)的施工成本,打破原有的思維,提高施工的質(zhì)量,在進(jìn)行施工之前要對施工的現(xiàn)場進(jìn)行分析,如果發(fā)現(xiàn)施工現(xiàn)場存在問題,要先對方案進(jìn)行完善和更改,確保給水和排水系統(tǒng)在施工中的穩(wěn)定性.

2.3正確的敷設(shè)和設(shè)計(jì)管道

在對建筑給水和排水管道進(jìn)行設(shè)計(jì)的過程中,要對管道進(jìn)行合理的敷設(shè)工作,特別是在衛(wèi)生間和廚房張,要進(jìn)行嚴(yán)格的管道敷設(shè)工作,在設(shè)計(jì)時(shí),應(yīng)該遵循相應(yīng)的原則.在分析給水和排水管道的設(shè)計(jì)標(biāo)準(zhǔn)時(shí),在設(shè)計(jì)衛(wèi)生器具時(shí)一定要合理,在給水和排水管道銜接的過程中,一定要防止?jié)B漏問題的發(fā)生.現(xiàn)在,很多規(guī)范還是不清晰的,導(dǎo)致了給水和排水管道在使用的過程中還是存在不合理的方面,在使用給水和排水管道中,應(yīng)該滿足用戶的要求,按照設(shè)計(jì)的合理性原則進(jìn)行,在充分了解建筑物特點(diǎn)的基礎(chǔ)上進(jìn)行.

2.4優(yōu)化管材的使用

設(shè)計(jì)人員在對給水和排水管道的管材選擇的過程中,應(yīng)該考慮到管材應(yīng)用的場合,管道敷設(shè)的方法和水流的壓力等,而且要選擇那些對水污染較小的新型的管材,或者在管材上涂抹材料,減少污染.設(shè)計(jì)人員在對管材選擇時(shí),要對不同材質(zhì)的管材搭配使用,選擇最合適的管材,分析各類材質(zhì)的管材的缺點(diǎn)和優(yōu)點(diǎn),使各類管材都能夠發(fā)揮出最大的效果.例如在冷水的供應(yīng)中一般選用的是PE管,在熱水供應(yīng)的過程中一般選用的是鋁塑復(fù)合材料的管材.

2.5降低管道的噪音

設(shè)計(jì)人員應(yīng)該分析管道產(chǎn)生噪音的原因,在此基礎(chǔ)上,可以通過設(shè)計(jì)減壓閥門,減小噪音.但是,減壓閥門自身也會產(chǎn)生一定的噪音,所以,在使用之前應(yīng)該對閥門進(jìn)行調(diào)試.

2.6降低水污染

設(shè)計(jì)人員在降低管道產(chǎn)生的水污染的過程中,要提高管道的材質(zhì),而且還有完善供水方式.現(xiàn)在,設(shè)計(jì)人員可以采用管網(wǎng)疊壓式的供水方式,這樣能夠減少供水中對水源產(chǎn)生二次污染.而且,設(shè)計(jì)人員還可以使用氣壓和水箱的方法,及時(shí)對水箱進(jìn)行清理工作,降低供水中產(chǎn)生的氣壓值.

3結(jié)語

在對建筑給水和排水系統(tǒng)進(jìn)行設(shè)計(jì)中,還是存在一定的問題的,管道容易出現(xiàn)噪音,產(chǎn)生二次水污染,管道的敷設(shè)不合理等問題,所以,針對這些問題,應(yīng)該采取相應(yīng)的措施,提高給水和排水系統(tǒng)的實(shí)用性.

參考文獻(xiàn):

〔1〕孫源忠.淺談建筑給水排水工程設(shè)施中存在的問題及其對策[J].科技資訊,2014(27):103.

〔2〕馬媛.淺談現(xiàn)代建筑給排水設(shè)計(jì)中存在的問題及對策[J].科技創(chuàng)新導(dǎo)報(bào),2015(07):200-201.

〔3〕陳文團(tuán).探討建筑給水排水工程設(shè)施中存在的問題及對策[J].江西建材,2015(20):137+139.

〔4〕《建筑給水排水設(shè)計(jì)規(guī)范》局部修訂及最大設(shè)計(jì)排水能力問題解析[J].給水排水,2011(06):118-122.

〔5〕陳俊,張學(xué)洪,曾鴻鵠.給水排水工程專業(yè)實(shí)踐教學(xué)存在的問題及對策[J].出國與就業(yè)(就業(yè)版),2011(17):114-115.

篇4

Abstract: The typical tasks in the course of "valuation measuring in water supply and drainage engineering" has been analyzed through the study of the water supply and drainage status of valuation courses,in combination with the technical requirements of water supply and drainage by actual construction business,and the changes in the current project valuation models and curriculum innovation.

關(guān)鍵詞:給排水工程計(jì)量計(jì)價(jià);典型工作任務(wù);工作過程

Key words: valuation measuring in water supply and drainage engineering;the typical tasks;the process of work

中圖分類號:G42 文獻(xiàn)標(biāo)識碼:A文章編號:1006-4311(2010)33-0195-01

1給排水工程計(jì)量計(jì)價(jià)的學(xué)習(xí)現(xiàn)狀及前景

1.1 給排水工程技術(shù)專業(yè)的學(xué)習(xí)現(xiàn)狀談及給排水工程計(jì)量計(jì)價(jià)的學(xué)習(xí)現(xiàn)狀,首先應(yīng)明確給排水工程技術(shù)專業(yè)學(xué)生的情況。在全國高等建筑類職業(yè)院校中,大部分學(xué)生在入學(xué)前對給排水專業(yè)不了解,給排水工程技術(shù)專業(yè)中有相當(dāng)一部分學(xué)生是想上建筑工程技術(shù)專業(yè)或工程造價(jià)專業(yè)沒有成功,服從分配來到給排水工程技術(shù)專業(yè)。對給排水的認(rèn)識僅限于下水道,專業(yè)認(rèn)識膚淺,自主學(xué)習(xí)意識模糊,專業(yè)認(rèn)知度低,心中充滿對給排水專業(yè)的茫然。

尤其有一些學(xué)生在入學(xué)前對工程造價(jià)專業(yè)情有獨(dú)鐘,認(rèn)為進(jìn)了給排水專業(yè),將來就難以從事工程造價(jià)工作。這種情況,一般由兩方面因素造成,首先是在學(xué)生之前的生活中,建筑工程技術(shù)專業(yè)的成果是他們每天每時(shí)每刻都能感受到的。大到國家的標(biāo)志性建筑物,小至居民小區(qū),大家注意的往往是建筑造型及建筑施工的難度,卻不會知道里面的給排水工程是怎樣。而且每個(gè)地區(qū)的凈水廠,污水廠由于其功能的特殊,常常建在河流的上、下游,且與居民區(qū)要求有一定的保護(hù)距離。很少有人在入學(xué)前看到過凈水廠,污水廠。其次,給排水專業(yè)宣傳不足,節(jié)水意識淡漠。傳統(tǒng)媒體常常是有大的水工程項(xiàng)目建設(shè)時(shí)或水污染嚴(yán)重時(shí),才能有適當(dāng)?shù)膱?bào)告。

1.2 給排水工程計(jì)量計(jì)價(jià)的從業(yè)現(xiàn)狀在建筑施工企業(yè)中,給排水工程計(jì)量計(jì)價(jià)工作往往不設(shè)專人負(fù)責(zé),通常由暖通專業(yè)人員連帶負(fù)責(zé),或者建筑工程技術(shù)專業(yè)造價(jià)員負(fù)責(zé)。給排水專業(yè)的技術(shù)人員由于專業(yè)面狹窄,與建筑工程技術(shù)專業(yè)相距甚遠(yuǎn),難以像其他專業(yè)人員那樣觸類旁通。因此,給排水專業(yè)的學(xué)生從事造價(jià)員工作的比例較少。

1.3 給排水工程計(jì)量計(jì)價(jià)的前景隨著環(huán)境問題的日益嚴(yán)重,飲水安全問題的日益嚴(yán)重,水污染問題的日益嚴(yán)重,國家已經(jīng)把環(huán)境問題,水問題提到了歷史最高點(diǎn)上,在國家的“十一五規(guī)劃”中專門提出加強(qiáng)城市供排水、中水管網(wǎng)改造和建設(shè),增強(qiáng)安全供水能力,擴(kuò)大再生水使用范圍,相應(yīng)提高了在城市供排水,農(nóng)村供排水等方面的基本建設(shè)投資。據(jù)黑龍江省“十一五規(guī)劃”到2010年市政基礎(chǔ)設(shè)施投資近1500億元,急需大量的給排水專業(yè)技術(shù)人員。大量給排水工程的上馬,也導(dǎo)致了給排水工程計(jì)量計(jì)價(jià)人員的緊缺。

2給排水工程計(jì)量計(jì)價(jià)課程典型工作任務(wù)分析

2.1 典型工作任務(wù)的特征基于以上給排水工程技術(shù)專業(yè)學(xué)生從事工程造價(jià)工作的現(xiàn)狀,和我們看到的給排水工程計(jì)量計(jì)價(jià)工作的前景,我們認(rèn)為有必要強(qiáng)化給排水工程計(jì)量計(jì)價(jià)課程對學(xué)生造價(jià)工作能力的培養(yǎng)。給排水工程計(jì)量計(jì)價(jià)課程是研究工程造價(jià)的一門課程,由于工程造價(jià)具有地區(qū)性、政策性、技術(shù)性、專業(yè)性、實(shí)踐性和綜合性的特點(diǎn),決定了《給排水工程計(jì)量計(jì)價(jià)》課程的內(nèi)容也具有很強(qiáng)的地區(qū)性、政策性、技術(shù)性、專業(yè)性、實(shí)踐性和綜合性。即該課程是給排水工程技術(shù)專業(yè)課程體系中具有“工學(xué)結(jié)合”特質(zhì)的課程。

在趙志群《職業(yè)教育工學(xué)結(jié)合課程的兩個(gè)基本特征》中講到職業(yè)教育工學(xué)結(jié)合課程的基本特征首先表現(xiàn)在“學(xué)習(xí)的內(nèi)容是工作、通過工作完成學(xué)習(xí)”,工學(xué)結(jié)合課程的核心載體是工作任務(wù)。即:學(xué)習(xí)內(nèi)容不再是脫離具體工作情境和工作過程的點(diǎn)狀的專業(yè)知識和操作技能,而是反映某一職業(yè)(或?qū)I(yè))的最重要的專業(yè)能力的、綜合性的“典型工作任務(wù)”典型工作任務(wù)是由某一職業(yè)中可以傳授的、相互聯(lián)系的綜合能力決定的,它不但描述了該職業(yè)的基本工作內(nèi)涵,而且能夠促進(jìn)從業(yè)人員的職業(yè)生涯發(fā)展。

典型工作任務(wù)應(yīng)具有以下幾個(gè)特征:首先,它不是具體的工作環(huán)節(jié),而在一個(gè)復(fù)雜的職業(yè)活動情境中具有結(jié)構(gòu)完整的工作過程,包括計(jì)劃、實(shí)施以及工作成果檢查評價(jià)等步驟;其次,反映該職業(yè)的主要工作內(nèi)容和典型工作形式;第三,在從業(yè)人員的職業(yè)生涯發(fā)展中具有重要的意義,在整個(gè)企業(yè)的工作(或經(jīng)營)流程里具有重要的功能;第四,完成該任務(wù)的方式和結(jié)果有較大的開放性。

2.2 給排水工程計(jì)量計(jì)價(jià)課程典型工作任務(wù)確定我院給排水工程技術(shù)專業(yè)培養(yǎng)具備城市給水工程、排水工程、建筑給水排水工程、工業(yè)給水排水工程等方面的知識,結(jié)合本專業(yè)學(xué)習(xí)的內(nèi)容和工程實(shí)際,我們在該課程中設(shè)置了三個(gè)典型工作任務(wù)。

工作任務(wù)1:松浦大橋引道15號排水泵站工藝安裝工程預(yù)算。學(xué)生通過完整地完成這個(gè)工作任務(wù),體驗(yàn)到工程計(jì)價(jià)工作的整個(gè)工作過程,能夠在特定的工作情境中,完成確認(rèn)工作任務(wù);計(jì)劃,即確認(rèn)完成工作任務(wù)的途徑、步驟和所需的工具;具體實(shí)施;檢查、評價(jià)與結(jié)果記錄,即對工作過程進(jìn)行質(zhì)量控制等四個(gè)步驟。通過這個(gè)工作任務(wù)掌握給排水工程所涉及到的工藝施工圖的識讀,安裝工程工程量的計(jì)算,以及類似工程的解決辦法。

工作任務(wù)2:建院家屬樓給排水工程的施工圖預(yù)算。學(xué)生通過這個(gè)工作任務(wù)能夠掌握建筑給排水,建筑供熱等工程的工程量計(jì)算,材料價(jià)格確定,人材機(jī)消耗量匯總的方法,解決在施工現(xiàn)場水暖不分家對給排水專業(yè)學(xué)生的困擾。

工作任務(wù)3:平房開發(fā)區(qū)江南中環(huán)路DN500給水管線的清單報(bào)價(jià)。學(xué)生通過這個(gè)工作任務(wù)能夠掌握工程量清單計(jì)價(jià)這種計(jì)價(jià)模式,包括清單工程量的計(jì)算,綜合單價(jià)的構(gòu)成及應(yīng)用以及清單報(bào)價(jià)的程序。

這三個(gè)典型工作任務(wù),基本涵蓋了給排水專業(yè)的學(xué)生在今后的工程實(shí)踐中可能遇到的工程計(jì)價(jià)情形。這門課程的目的是讓學(xué)生學(xué)會工程計(jì)價(jià)這門工作,通過典型工作任務(wù)的完成,讓學(xué)生親歷完整的工作過程,取得一定的工作成果,完整地解決一個(gè)實(shí)際的綜合性問題。

總之,典型工作任務(wù)的確定是一個(gè)復(fù)雜的系統(tǒng)工程,應(yīng)當(dāng)建立在整體化的、過程導(dǎo)向的職業(yè)分析基礎(chǔ)之上,將職業(yè)分析、工作任務(wù)分析、企業(yè)生產(chǎn)(或經(jīng)營)過程分析、個(gè)人發(fā)展目標(biāo)和教學(xué)分析設(shè)計(jì)等結(jié)合在一起。

參考文獻(xiàn):

[1]趙志群.職業(yè)教育工學(xué)結(jié)合課程的兩個(gè)基本特征[Z].

篇5

1 以就業(yè)為導(dǎo)向,適時(shí)調(diào)整教學(xué)計(jì)劃

教學(xué)計(jì)劃是學(xué)校組織和管理教學(xué)工作的主要依據(jù),體現(xiàn)著一種專門人才培養(yǎng)規(guī)格的基本要求。

在市場經(jīng)濟(jì)改革的大潮中,高職院校培養(yǎng)的學(xué)生與企業(yè)用人要求之間有一定的差距,企業(yè)需要的是上崗即頂崗的畢業(yè)生,而許多畢業(yè)生由于缺乏實(shí)踐經(jīng)驗(yàn),動手能力較差,很多單位不得不對新人進(jìn)行為期半年到一年的培訓(xùn)。在這段時(shí)間里,單位不但用人需求無法得到滿足,還要為培訓(xùn)而支付大量的人力、財(cái)力,而將來一旦培養(yǎng)對象跳槽,又會造成單位人才投資的巨大損失,所以企業(yè)更看重的是應(yīng)聘者的實(shí)踐能力。

針對以上現(xiàn)象,加之市場調(diào)研結(jié)果,給排水工程技術(shù)專業(yè)的畢業(yè)生大多數(shù)就業(yè)于建筑施工企業(yè),為了讓學(xué)生掌握更多的施工技能,我們調(diào)整了教學(xué)計(jì)劃,將最后一學(xué)期畢業(yè)設(shè)計(jì)時(shí)間由原來的七周改為三周,將原來的給排水管網(wǎng)設(shè)計(jì)內(nèi)容改為給排水施工組織設(shè)計(jì),相應(yīng)的增加了頂崗實(shí)習(xí)時(shí)間。學(xué)生以企業(yè)員工的身份參加實(shí)際工程項(xiàng)目或工作任務(wù),鍛煉實(shí)際操作能力。在實(shí)習(xí)期間對學(xué)生提出具體要求,實(shí)習(xí)結(jié)束后,學(xué)生需要回學(xué)校通過畢業(yè)實(shí)習(xí)答辯,根據(jù)實(shí)習(xí)答辯情況、學(xué)生的實(shí)習(xí)日記、總結(jié)及企業(yè)對學(xué)生的鑒定綜合評定實(shí)習(xí)成績。通過頂崗實(shí)習(xí)鍛煉,培養(yǎng)學(xué)生的職業(yè)崗位能力,實(shí)現(xiàn)畢業(yè)生“零距離”上崗。

2 根據(jù)職業(yè)崗位需求進(jìn)行課程整合

結(jié)合目前專業(yè)學(xué)制和學(xué)時(shí)特點(diǎn)以及專業(yè)人才培養(yǎng)目標(biāo),我們對基礎(chǔ)理論課適當(dāng)精簡內(nèi)容、降低難度,以“必需、夠用”為原則,突破學(xué)科體系束縛,加強(qiáng)人才培養(yǎng)的針對性和實(shí)用性。我們對給排水工程技術(shù)專業(yè)做了如下調(diào)整:

首先,根據(jù)水處理工藝的發(fā)展――水處理工藝不再區(qū)分給水、污水,我們將原來的《給水管網(wǎng)工程》、《排水管網(wǎng)工程》課程整合為《給水排水管道工程》;將《給水處理工程》和《污水處理工程》整合為《水處理工程》。原來的給水處理和污水處理分開設(shè)置時(shí),其中關(guān)于沉淀池、沉砂池、調(diào)節(jié)池等內(nèi)容需要重復(fù)講解,既浪費(fèi)課時(shí)又讓學(xué)生覺得繁瑣,而合并后的水處理工程將所有的處理工藝放在一門課程中講解;在給水排水管道工程中,關(guān)于管道的最小覆土厚度、冰凍深度等內(nèi)容不再重復(fù),這樣不但節(jié)約了課時(shí),而且內(nèi)容更加合理、連貫,教學(xué)效果明顯提高。整合后的課程,在教材選擇上,可與高職高專指導(dǎo)委員會推薦教材相一致。其次,考慮到在實(shí)際工作中,不論是設(shè)計(jì)單位還是施工單位,往往是“水暖不分家”,為了建立較為完整的知識體系,也為了給學(xué)生創(chuàng)造更多地就業(yè)機(jī)會,我們在給水排水工程技術(shù)專業(yè)的教學(xué)計(jì)劃中增加了《供熱工程》課程,學(xué)生反映良好。再次,依照行業(yè)發(fā)展的現(xiàn)狀,為了更好的適應(yīng)市場需求,在原有建筑給水排水的基礎(chǔ)上增加《高層建筑給水排水》課程,以拓寬學(xué)生知識面。

新的教學(xué)計(jì)劃在投入到教學(xué)中后,教學(xué)效果明顯,學(xué)生的學(xué)習(xí)興趣和學(xué)習(xí)效果有所提高,而且也縮短了學(xué)生畢業(yè)后走上社會的適應(yīng)期。

3 注重實(shí)踐教學(xué)

大學(xué)生實(shí)踐能力的培養(yǎng)日益受到人們的重視,因?yàn)閷?shí)踐是創(chuàng)新的基礎(chǔ)。高職高專的培養(yǎng)目標(biāo)是培養(yǎng)高素質(zhì)技能型人才。所以我們應(yīng)該徹底改變傳統(tǒng)教育模式下實(shí)踐教學(xué)處于從屬地位的狀況,將培養(yǎng)學(xué)生的實(shí)際動手能力和實(shí)踐應(yīng)用能力作為重要任務(wù),經(jīng)過多次修改與討論,構(gòu)建了較為科學(xué)合理的人才培養(yǎng)方案。

我們以專業(yè)技術(shù)能力培養(yǎng)為中心,加強(qiáng)學(xué)生的基本技能訓(xùn)練,全面提高學(xué)生的綜合能力,建立與理論課程體系相對應(yīng)的實(shí)踐課程體系。為達(dá)到人才培養(yǎng)目標(biāo)和基本規(guī)格,除集中安排各類實(shí)習(xí)外,在理論教學(xué)中同樣要貫徹理論聯(lián)系實(shí)際、培養(yǎng)學(xué)生動手能力、掌握技能的原則,課程內(nèi)容包括實(shí)際操作的訓(xùn)練,明確訓(xùn)練達(dá)到的基本要求。在新調(diào)整后的教學(xué)計(jì)劃中,實(shí)踐性教學(xué)課時(shí)約占總課時(shí)的50%,能夠保證學(xué)生在校期間就有一定的時(shí)間來進(jìn)行實(shí)踐能力的培養(yǎng)和提高,畢業(yè)后能夠直接或較快的適應(yīng)工作崗位。增強(qiáng)了學(xué)生的就業(yè)競爭能力,使他們在嚴(yán)峻的就業(yè)形勢下爭得一席之地。

實(shí)踐性教學(xué)過程必須由實(shí)踐經(jīng)驗(yàn)豐富的教師完成,才能將達(dá)到良好的教學(xué)效果。鑒于給排水教研室大多數(shù)都是年輕教師,缺乏實(shí)踐經(jīng)驗(yàn),所以本著對學(xué)生認(rèn)真負(fù)責(zé)、對實(shí)訓(xùn)課程重視的態(tài)度,目前很多的實(shí)踐性課程由機(jī)電與環(huán)境工程學(xué)院暖通專業(yè)有經(jīng)驗(yàn)的老教師擔(dān)任,并與暖通專業(yè)合用實(shí)訓(xùn)室。同時(shí),我們也在積極培養(yǎng)年輕教師來擔(dān)任實(shí)踐性課程。

為滿足現(xiàn)在市場持證上崗的需要,使學(xué)生在獲取本專業(yè)學(xué)歷證書的同時(shí),還獲得與專業(yè)相應(yīng)的職業(yè)資格證書,畢業(yè)后直接上崗。實(shí)踐教學(xué)采用單項(xiàng)與綜合相結(jié)合、模擬與實(shí)際相結(jié)合、校內(nèi)與校外相結(jié)合的方式,邊講、邊教、邊做。學(xué)生學(xué)習(xí)興趣濃厚,而且學(xué)到的知識更加實(shí)用,教學(xué)效果良好。

4 加強(qiáng)師資隊(duì)伍建設(shè)

教師是教學(xué)改革的主體,教師素質(zhì)是關(guān)系到教學(xué)改革能否成功的關(guān)鍵。根據(jù)學(xué)院十二五規(guī)劃和我院給排水專業(yè)師資力量年輕化的實(shí)際情況,在師資力量建設(shè)方面做了如下工作:

4.1 連續(xù)幾年引進(jìn)數(shù)名具有研究生學(xué)歷的給水排水專業(yè)的教師,其中有的教師具有一定的工作經(jīng)驗(yàn),從而充實(shí)了我們的專業(yè)教師隊(duì)伍,能夠更好地帶動整個(gè)教研室的理論實(shí)踐教學(xué)。同時(shí)我教研室與具有實(shí)踐經(jīng)驗(yàn)的部分企業(yè)的技術(shù)管理人員建立了穩(wěn)定的聘任關(guān)系,定期的聘請他們到學(xué)校給教師、學(xué)生傳達(dá)一些與專業(yè)相關(guān)的新技術(shù)、新材料、新工藝等,讓我們及時(shí)了解專業(yè)動態(tài)。

4.2 鼓勵現(xiàn)有教師有計(jì)劃地進(jìn)行在職研究生學(xué)習(xí),繼續(xù)提高學(xué)歷水平,逐漸形成學(xué)歷層次高、職稱比例協(xié)調(diào)、業(yè)務(wù)能力過硬的教師隊(duì)伍;針對多數(shù)青年教師從學(xué)校到學(xué)校,實(shí)踐機(jī)會較少的情況,不能很好的適應(yīng)于高職高專的教學(xué)要求,在不影響正常教學(xué)過程的情況下,我們有計(jì)劃的安排一部分教師,特別是年輕教師和新引進(jìn)教師到有關(guān)企業(yè)進(jìn)行實(shí)踐鍛煉,培養(yǎng)其工程實(shí)踐的能力,這為課堂實(shí)踐教學(xué)提供了師資保證。

4.3 努力建立一支相對穩(wěn)定的、具有較高素質(zhì)的外聘教師隊(duì)伍。就高職高專教學(xué)特點(diǎn),安排青年教師、外聘教師的培訓(xùn),使他們在教學(xué)過程中更能抓住重點(diǎn)。

篇6

【關(guān)鍵字】高層建筑;給排水工程;消防水系統(tǒng);給排水設(shè)計(jì)

一、高層建筑給排水工程發(fā)展現(xiàn)狀

高層建筑的建筑標(biāo)準(zhǔn)高。給水排水設(shè)備使用人數(shù)多,水量大,一旦發(fā)生停水或排水管道堵塞事故,影響范圍大;豎向分區(qū)多;動力設(shè)備多;火災(zāi)隱患大;高層建筑的排水量大,管道長,管道中壓力波動大。

目前,如何合理地設(shè)計(jì)給排水及消防系統(tǒng),對高層建筑日常運(yùn)行的經(jīng)濟(jì)性,以及消防時(shí)的安全性和可靠性是高層建筑給排水設(shè)計(jì)最主要的問題。當(dāng)前的高層給排水技術(shù)總體上日趨成熟,但也存在許多待解決的問題:

(1)新型減壓、穩(wěn)壓設(shè)備的研制與應(yīng)用;(2)安全可靠經(jīng)濟(jì)實(shí)用運(yùn)行管理方便的供水技術(shù)的研究與推廣應(yīng)用;(3)低成本高效能新型管道材料的開發(fā)與應(yīng)用;(4)高層建筑消防與自動控制技術(shù);(5)提高排水系統(tǒng)過水能力,穩(wěn)定排水系統(tǒng)壓力的技術(shù)措施;為了適應(yīng)和推動高層建筑的發(fā)展,必須不斷改進(jìn)和提高給排水的技術(shù)水平。

二、高層建筑給排水系統(tǒng)的設(shè)計(jì)方法

1、廚房、衛(wèi)生間的布置

廚房、衛(wèi)生間的布置從專業(yè)分工來說是建筑專業(yè)必須考慮的事情,但一到矛盾出來的時(shí)候,似乎又變成了給排水專業(yè)必須承擔(dān)的責(zé)任。所以,從廚、衛(wèi)的功能上看應(yīng)該把廚、衛(wèi)的布置看成各專業(yè)共同的事情,這樣便于設(shè)計(jì)人員轉(zhuǎn)變觀念。那種認(rèn)為建筑專業(yè)怎么布置,給排水專業(yè)就怎么配管的做法是錯(cuò)誤的,必須做到提前介入,變被動為主動。從給排水專業(yè)設(shè)計(jì)角度來講,小康住宅廚、衛(wèi)布置主要考慮兩個(gè)方面的問題:(1)應(yīng)特別強(qiáng)調(diào)以人為中心,在設(shè)備選擇與空間布置上應(yīng)滿足人體工程學(xué)的基本要求。(2)給排水主管位置是否合適,支管走向設(shè)計(jì)是否簡捷、順暢、合理,要注意協(xié)調(diào)好給排水主管位置與衛(wèi)生器具布置之間的相互關(guān)系。

2、給排水管道的敷設(shè)設(shè)計(jì)

給排水管道明敷設(shè)時(shí),常沿墻、梁、柱敷設(shè),并滿足施工、維護(hù)、檢修的間距要求即可,在設(shè)計(jì)中最常見。給排水管道暗敷設(shè)時(shí),給水管相對排水管而言,由于是壓力管,且管徑較細(xì),故其暗敷有一定的優(yōu)越性。室內(nèi)給水管常見的暗敷方式分直埋式和非直埋式。

直埋式又分以下幾種方法:(1)埋地或在地坪面層內(nèi)敷設(shè)。給水管埋地敷設(shè)時(shí),應(yīng)避免布置在可能受重物壓壞處或受振動而損壞處。埋地管道的敷土厚度,金屬管不得<0.3m;塑料管管徑≤50mm時(shí),不宜小于0.5m;管徑>50mm時(shí),不宜小于0.7m。管道如設(shè)在地坪面的面層內(nèi),可在板面適當(dāng)剔出管槽,冷、熱水管平行走,避免交叉,安裝時(shí)試崖驗(yàn)收合格后,再作建筑找平。.采用卡套式或卡環(huán)式接口連接的管道,當(dāng)敷設(shè)在找平層或管槽內(nèi)時(shí),宜采用分水器向各用水點(diǎn)配管,中途不得有連接配件,兩端接口應(yīng)明露。(2)嵌墻敷設(shè)。給水支管若暗裝于磚墻內(nèi),則在磚墻內(nèi)開管槽。管槽寬度宜為管子外徑大20mm,管槽深為管子外徑。給水支管如敷設(shè)的墻面是鋼筋混凝土剪力墻,則應(yīng)貼于墻表面,并用管卡子固定于墻面,待土建墻面施工時(shí),用水泥砂漿抹平。嵌墻敷設(shè)的塑料管、復(fù)合管管徑不宜大于25mm,嵌墻橫管距地面不宜大于450mm 。嵌墻敷設(shè)的薄壁不銹鋼管宜采用覆塑薄壁不銹鋼管,并不得采用卡套式連接,管徑不宜大于20mm 。非直埋式的方法有管道設(shè)在管道井、吊頂內(nèi),地坪架空層內(nèi)兩種。住宅排水管明敷或暗設(shè)布置應(yīng)根據(jù)建筑物的性質(zhì)、使用要求和建筑平面布局確定。

三、高層建筑消防水系統(tǒng)的設(shè)計(jì)方法

1、正確設(shè)置消防水池及保證高層建筑兩路供水

通常在高層建筑中,在市政供水不能滿足消防用水量要求或市政為單路進(jìn)水時(shí),規(guī)范都要求設(shè)置消防水池。計(jì)算消防水池容積時(shí),應(yīng)將火災(zāi)延續(xù)時(shí)間內(nèi)室內(nèi)各消防用水量之和減去市政進(jìn)水管的補(bǔ)水量。補(bǔ)水時(shí)間可按最長的火災(zāi)延續(xù)時(shí)間計(jì)。如果要考慮室外消防用水量或是設(shè)置生活、消防共用水池,則還需要補(bǔ)充相應(yīng)的用水量。當(dāng)設(shè)置生活、消防共用水池時(shí),不能利用建筑物的本體結(jié)構(gòu)做水池池壁以及池底,以防止生活水質(zhì)污染。對此,《強(qiáng)制性條文》中已經(jīng)明令禁止。同理,如果高層建筑屋頂設(shè)有生活、消防共用水箱,也應(yīng)滿足該要求。從消防水池接入水泵間的引入管應(yīng)該保證不少于2根,如果在接入泵房前就將引入管匯合為一,對消防水池而言,僅為單路供水,存在供水的安全隱患。同時(shí),從消防水泵接入各消防管網(wǎng)的供水管也應(yīng)保證兩路。

2、正確設(shè)置消防水池及保證高層建筑兩路供水

(1)走道噴頭的布置。在高層建筑中,為了美觀往往設(shè)有吊頂,隱藏結(jié)構(gòu)梁及各專業(yè)管道。而走道通常是各種管道最為集中的地方,特別是設(shè)置集中空調(diào)的高層建筑,結(jié)構(gòu)梁、空調(diào)風(fēng)管以及分層布置的給排水、電力管線等使設(shè)有吊頂?shù)淖叩纼艨战档?,若其吊頂形式為悶頂,則其悶頂?shù)膬艨崭叨葮O有可能大于800mm。而《自噴規(guī)范》規(guī)定:“凈空高度大于800mm的悶頂和技術(shù)夾層內(nèi)有可燃物時(shí),應(yīng)設(shè)置噴頭。”這是我們在設(shè)計(jì)中容易忽視的地方。由于走道內(nèi)管道眾多,設(shè)計(jì)中往往會出現(xiàn)直接在自噴配水管上、下接噴頭的錯(cuò)誤做法。首先這種接法不符合配水支管允許設(shè)置噴頭數(shù)量(≤8個(gè))的規(guī)定,其次走道內(nèi)的自噴配水管往往管徑較大,它缺少接小管徑噴頭的管件,在安裝上也有弊病。所以,走道內(nèi)的噴頭應(yīng)該從配水支管上接出為宜,在管線的布置上應(yīng)與暖通、電力專業(yè)密切配合。

(2)高層建筑部分層自噴配水管入口應(yīng)按要求減壓。新《自噴規(guī)范》規(guī)定:“管道直徑應(yīng)經(jīng)水力計(jì)算確定。配水管道的布置,應(yīng)使配水管入口的壓力均衡。輕危險(xiǎn)級、中危險(xiǎn)級場所中各配水管入口的壓力均不宜大于0.4MPa?!倍稀蹲試娨?guī)范》對此并無具體要求。高層住宅火災(zāi)危險(xiǎn)等級一般為中危險(xiǎn)級,自噴水泵是根據(jù)最高層最不利噴頭工作壓力經(jīng)過計(jì)算而選擇。實(shí)踐證明,設(shè)計(jì)中計(jì)算的最不利層配水管入口處所需壓力均不大于0.3Mpa(最不利噴頭工作壓力按0.05MPa計(jì)),由于自噴水泵的揚(yáng)程還需考慮建筑高度、水力損失等因素,故必使高層建筑的底部幾層配水管入口處壓力大于0.4MPa。因而在設(shè)計(jì)時(shí),在自噴水泵揚(yáng)程的確定上不能一味放大了事,應(yīng)該在自噴平面布置完畢后通過水力計(jì)算校核水泵揚(yáng)程,并在此基礎(chǔ)上校核底部幾層配水管入口處壓力。

四、結(jié)束語

綜上所述,在高層建筑給排水及消防設(shè)計(jì)中不僅要滿足設(shè)計(jì)規(guī)范,而且要求設(shè)計(jì)者在滿足甲方的要求同時(shí)還要符合當(dāng)?shù)芈毮懿块T設(shè)計(jì)規(guī)定;更要對用戶的需求充分了解,真正做到以人為本,在設(shè)備選擇與空間布置上更好地滿足人們對居住環(huán)境的要求。

參考文獻(xiàn)

篇7

關(guān)鍵詞 住宅;設(shè)計(jì);給水;排水;管道;工程;

Abstract: With the social development and progress, more and more attention to the residential area's water supply and drainage pipe network design, water supply and drainage pipe network design for the real life of great significance. This paper describes the residential quarters of the water supply and drainage pipe network design.

Keywords housing; design; water supply; drainage; pipeline; engineering;

中圖分類號:S611文獻(xiàn)標(biāo)識碼:A 文章編號:

引言

隨著人民生活水平的不斷提高,為滿足居民對高質(zhì)的需求,在世紀(jì)之交,要求住宅的設(shè)計(jì)和施工具有更多的適應(yīng)性、靈活性,要求賦予住宅更高的科技含量和文化內(nèi)涵?,F(xiàn)在,住宅建設(shè)的核心已從單純滿足人們溫飽型的居住生存條件轉(zhuǎn)變?yōu)樘峁┤轿灰匀藶楸?、小康型的生活空間這一方面上來。許多房地產(chǎn)商把高級住宅作為開發(fā)的重點(diǎn),大量舒適、高雅、享受型的住宅得以建設(shè)。

1、工程概況

1.1、實(shí)例小區(qū)的總體特點(diǎn)

1.1.1地下車庫的建筑面積大。連接關(guān)系復(fù)雜該小區(qū)由9幢小高層住宅、10幢洋房、15幢別墅商業(yè)裙房、會所、物業(yè)用房、幼兒園及地下車庫等組成,建筑規(guī)劃建設(shè)用地約為8萬平方米。小區(qū)總建筑面積約28萬m2,分兩期建設(shè),筆者參與了二期設(shè)計(jì)。小區(qū)9幢小高層住宅、10幢洋房,全部坐落在小區(qū)地下室上部,15幢別墅在地下室外,建筑物的分布是:靠江邊的是別墅區(qū),接著是洋房,然后是小高住宅。小區(qū)內(nèi)地下室為汽車庫和設(shè)備用房。

1.1.2管線多,規(guī)格大。系統(tǒng)復(fù)雜、敷設(shè)難度大由于甲方為降低工程造價(jià)、便于后期管理,要求將小區(qū)內(nèi)的所有供水、消防、動力、電力設(shè)備均集中設(shè)置在小區(qū)地下一層的設(shè)備用房內(nèi),這樣勢必造成小區(qū)總體管網(wǎng)多,管徑大,管道復(fù)雜。且車庫頂板上覆土深度有限,僅為1.2米,小區(qū)內(nèi)設(shè)有水景、園建等景觀管道,還有暖通專業(yè)的部分管溝,空間非常緊張。因此把所有管道都設(shè)置在覆土層是不現(xiàn)實(shí)的。為方便施工和后期管理,將壓力管線均敷設(shè)在地下車庫內(nèi)。

2、給排水綜合管網(wǎng)的設(shè)計(jì)要點(diǎn)

給水、熱水、消防等有壓管道均設(shè)于地下車庫頂板下本小區(qū)地下車庫層高3.6米,扣除800ram的大梁人防的部分地方還有1.0米的大梁),大部分地方凈高只有2.8m,而甲方為降低土建造價(jià),不愿意再加大車庫的凈高,為滿足規(guī)范和使用要求,留給設(shè)備專業(yè)的布管空間就相對較小。而暖通專業(yè)的地下車庫風(fēng)管、住宅的給水及消防管道、電氣專業(yè)的電纜橋架都要設(shè)置和車庫頂板下,這就要求我們在管線布置時(shí)要統(tǒng)一協(xié)調(diào),盡量避免交叉。經(jīng)過水、暖、電三個(gè)專業(yè)的協(xié)商配合,最終決定:因水專業(yè)進(jìn)單體管道較多,管道走車庫周邊最,可就近接入單體;其次是暖通管道和電氣橋架。本著一個(gè)大原則:小管讓大管,有壓讓無壓,從而保證了地下車庫的使用高度。

3、給水管道工程設(shè)計(jì)

3.1、管徑確定

管徑確定時(shí)應(yīng)考慮遠(yuǎn)近期結(jié)合,同時(shí)照顧經(jīng)濟(jì)性和可靠性。管徑確定涉及設(shè)計(jì)供水量及經(jīng)濟(jì)流速的確定。設(shè)計(jì)供水量根據(jù)下列各種用水確定:

(1)居住生活用水量。

(2)公共建筑用水量。

(3)綠化用水量。

(4)水景、娛樂設(shè)施用水量。

(5)道路、廣場用水量。

(6)公用設(shè)施用水量。

(7)未預(yù)見用水量及管網(wǎng)漏失水量。

(8)消防用水量。

消防用水量僅用于校核管網(wǎng)計(jì)算,不屬正常用水量。居住小區(qū)的室外給水管道,不論小區(qū)規(guī)模及管網(wǎng)形狀,均應(yīng)按《建筑給排水設(shè)計(jì)規(guī)范》3.6.1條第2款規(guī)定計(jì)算節(jié)點(diǎn)流量,再疊加區(qū)內(nèi)一次火災(zāi)的最大消防流龜(有消防貯水和專用消防管道供水的部分應(yīng)扣除),對管道進(jìn)行水力計(jì)算校核,管道末梢的室外消火栓從地面算起的水壓,不得低于0.1MPa。設(shè)有室外消火栓的室外給水管道,管徑不得小于100mm。管徑的確定應(yīng)綜合考慮管網(wǎng)造價(jià)與經(jīng)營費(fèi)用,確定經(jīng)濟(jì)流速,從而確定經(jīng)濟(jì)管徑,使管網(wǎng)造價(jià)與經(jīng)營費(fèi)用之和為最小。設(shè)計(jì)時(shí)常采用平均經(jīng)濟(jì)流速來確定管徑,當(dāng)D=100’400mm時(shí),平均經(jīng)濟(jì)流速取0.6-0.9m/s; 當(dāng)D≥400mm時(shí),平均經(jīng)濟(jì)流速取0.9-1.4m/s,大管取大值,小管取小值。

3.2、管材選用

設(shè)計(jì)時(shí)應(yīng)結(jié)合各種管材的特性做到管材選用經(jīng)濟(jì)、合理。埋地管道長年累月承受輸送液體內(nèi)壓、泥土及地面荷載的外壓、高溫變化引起的拉伸應(yīng)力以及地基的不均勻沉降等產(chǎn)生的綜合應(yīng)力,還要承受水錘沖擊力,因此管材首先應(yīng)有足夠強(qiáng)度。同時(shí)結(jié)合建設(shè)要求做到經(jīng)濟(jì)合理。室外給水管道常用管材有承插式給水鑄鐵管、球墨鑄鐵管、焊接鋼管、鍍鋅鋼管、預(yù)應(yīng)力(自應(yīng)力)鋼筋混凝土管、玻璃鋼管、塑料管、復(fù)合管等。

(1)承插式給水鑄鐵管:具有較高的機(jī)械強(qiáng)度及承壓能力,有較強(qiáng)的耐腐蝕性,接口方便,易于施工。其缺點(diǎn)在于不能承受較大的動荷載及質(zhì)脆。按制造材料分為普通灰口鑄鐵管和球墨鑄鐵管,較為常用的為球墨鑄鐵管。

(2)鋼管:其優(yōu)點(diǎn)是耐高壓、耐震動、薄而輕及管節(jié)長而接口少;缺點(diǎn)是易銹蝕影響使用壽命、價(jià)格較高,故需做嚴(yán)格防腐絕緣處理。鋼管一般用于管徑要求大、受水壓力高路段,及穿越鐵路、河谷和地震區(qū)等管段。

4、排水管道工程的設(shè)計(jì)

排水管道為兩路進(jìn)水,繞小區(qū)成環(huán)并在其上設(shè)置室外消火栓,將水供至地下室貯水池,并且在小區(qū)環(huán)狀管網(wǎng)上還應(yīng)考慮布置室外消火栓以及綠化澆灑用水的灑水栓。由于商業(yè)用水與生活用水的計(jì)量方式不同,在市政管網(wǎng)單獨(dú)設(shè)置一塊水表引至各個(gè)商業(yè)用水點(diǎn)。鑒于以上兩種管道與地下車庫以及各個(gè)單體的聯(lián)系不大,且主要用于室外給水及消防,為了盡量減少地下車庫的安裝難度,將上述兩種管道設(shè)于地下室頂覆土層內(nèi),并盡量設(shè)于綠地下部,可盡量避免上部荷載對管道的影響。

4.1污水管道優(yōu)先布置

按照城市排水體制,室外污水和雨水為分流制排水系統(tǒng),生活污水均經(jīng)化糞池處理后排至市政污水管道。由于污水管道數(shù)墾多,連接復(fù)雜,且為重力流,必須優(yōu)先布置。當(dāng)然,優(yōu)先布置并不是說就不考慮其它管道管線。我們最早在進(jìn)行每個(gè)單體的設(shè)計(jì)時(shí),水專業(yè)就與建筑專業(yè)及其它專業(yè)密切配合,根據(jù)室外總體與各棟單體的具體情況。確定單體的給排水與其它專業(yè)管道的進(jìn)出口位置,做到排水管道與其它專業(yè)管道在室外均能避開,尤其在室外總體做到管道不沖突,不交叉,這樣就可充分利用覆土層的有限高度,將所有管道合理有效的布置。由于本小區(qū)占地面積大、使用人數(shù)多,管線關(guān)系復(fù)雜,若是集中設(shè)置化糞池,將會占用很大的地下面積,且要增加大量的排水管道,對排水系統(tǒng)不利,同時(shí)也增加了以后維護(hù)工作的難度??紤]本小區(qū)的東西兩邊均為市政道路,且與小區(qū)同時(shí)施工建設(shè),經(jīng)與市政部門協(xié)商,在道路施工過程中為小區(qū)預(yù)留污水排放井供小區(qū)污水排放。因此在室外根據(jù)具置,利用單體周圍無地下室的空地處分散布置了五個(gè)化糞池,將小區(qū)污水分散排放,避免了在中央車庫頂布置大量排水管道,從而進(jìn)一步減少了各種管道的交叉。

4.2雨水設(shè)計(jì)采用暗溝與管道結(jié)合方式收集排放

如果雨水按常規(guī)的檢查井、雨水管方式設(shè)置,那么雨水管道也要設(shè)于覆土層內(nèi),一旦雨水管道與排水管道相碰,將沒有足夠的高度讓兩種管道避開。通過與建筑專業(yè)以及景觀專業(yè)的協(xié)商,決定地下室車庫頂?shù)挠晁捎冒禍吓潘?,溝?00mm,以便于清通維護(hù),坡度O.004,在暗溝上間隔適當(dāng)?shù)木嚯x設(shè)置雨水篦子收集雨水。在車庫范圍外和別墅區(qū)設(shè)置雨水檢查井,將雨水暗溝排水改為雨水管道排水。在道路及單體周圍按照常規(guī)設(shè)置雨水篦子收集雨水。小區(qū)地面雨水采用就地入滲和雨水滲管方式。與污水管道同樣,市政也為本小區(qū)預(yù)留了四個(gè)雨水排放井供本小區(qū)雨水排放。因此將小區(qū)雨水分散排放,盡量可能多的避免了雨水管道與污水管道的交叉,減少了管道的敷設(shè)深度,降低了工程造價(jià)。

結(jié)束語

建筑設(shè)計(jì)作為一個(gè)整體的工程,是各個(gè)專業(yè)協(xié)作的結(jié)果,有些方案在本專業(yè)的角度看起來好一些,但對工程整體的影響就不一定如此??梢哉f,一個(gè)工程各專業(yè)協(xié)同度越高,它的整體效果就越好。合作與協(xié)同的藝術(shù)對給排水工程師至關(guān)重要。給水排水設(shè)計(jì)中,往往受場地和標(biāo)高的限制而需要考慮管線的相互避讓和調(diào)整,這是小區(qū)室外給排水設(shè)計(jì)中的難題。一個(gè)給排水工程師的現(xiàn)代設(shè)計(jì)意識是由嚴(yán)謹(jǐn)而開放的知識結(jié)構(gòu)、簡潔而實(shí)用的表示方法、工程整合、良好的服務(wù)意識、獨(dú)立思維和與社會發(fā)展同步諸方面構(gòu)成。

參考文獻(xiàn)

【1】《室外給水設(shè)計(jì)規(guī)范》(GBJl3-86)(1997年版)

【2】《室外排水設(shè)計(jì)規(guī)范》(GBJl4-97(1997年版)

【3】《城市排水工程規(guī)劃規(guī)范》(6850318-2000)

【4】吳春葆,小區(qū)綜合管網(wǎng)質(zhì)量控制有效措施分析,山西建筑,2009年4月第35卷第12期:196-198

篇8

【關(guān)鍵詞】建筑工程;設(shè)備安裝;施工質(zhì)量;防治方法

一、概述

隨著我國經(jīng)濟(jì)接軌國際前沿,建筑領(lǐng)域步入了全面現(xiàn)代化、智能化的發(fā)展時(shí)期,建筑行業(yè)整體專業(yè)素質(zhì)、生產(chǎn)施工工藝與技術(shù)裝備水平近年來得到大幅度地提高,建筑設(shè)備和建筑材料等領(lǐng)域也有日新月異的發(fā)展。建筑消防設(shè)施施工、給水排水工程、電氣安裝工程、通風(fēng)空調(diào)系統(tǒng)安裝工程等行業(yè)配套施工與設(shè)備安裝工程是所有系統(tǒng)工程的重要組成部分,隨著科學(xué)技術(shù)的進(jìn)步,設(shè)備的更新?lián)Q代,對各種工程系統(tǒng)設(shè)備安裝水平、質(zhì)量也提出了更高的要求。以下是筆者對建筑工程設(shè)備安裝現(xiàn)存質(zhì)量問題產(chǎn)生原因的分析,及其防治方法的討論。

二、建筑設(shè)備安裝質(zhì)量問題的產(chǎn)生原因

目前我國建筑施工實(shí)踐活動中,建筑設(shè)備安裝經(jīng)常遇到質(zhì)量問題既具有一定的普遍性,又兼具專業(yè)的特殊性。正是由于建筑工程設(shè)備安裝涉及的專業(yè)眾多,因此我們必須根據(jù)系統(tǒng)分類和施工流程的不同方面進(jìn)行分析、討論,而不是籠統(tǒng)概括或單一片面的看問題。建筑消防設(shè)施施工、給水排水工程、電氣安裝工程、通風(fēng)空調(diào)系統(tǒng)安裝都是建筑物中必不可少的設(shè)備安裝工程。下面我們就對以上四個(gè)方面主要存在的設(shè)備安裝若干質(zhì)量問題進(jìn)行具體歸類說明和原因分析。

a)建筑消防設(shè)備安裝常見質(zhì)量問題

作為重要公共建筑和高層建筑消防系統(tǒng)的核心部分,自動噴水滅火系統(tǒng)的設(shè)備安裝是審查檢修時(shí)出現(xiàn)問題最多的地方。常見的有:感溫玻璃噴頭設(shè)計(jì)安裝高度,以及與周圍墻體的實(shí)際距離不符合消防規(guī)范要求,這種問題可能造成發(fā)生火災(zāi)時(shí)由于噴頭與火源距離太遠(yuǎn),感溫部件不能及時(shí)反應(yīng),從而延誤噴水最佳時(shí)間導(dǎo)致火勢迅速蔓延;設(shè)置在屋頂?shù)南浪浒惭b時(shí),常出現(xiàn)施工方擅自將消防用水箱與其他用水合并的違規(guī)情況;另外為了施工省事,省材料,也常出現(xiàn)隨意改變消防給水管的設(shè)計(jì)位置,減少閥門,未設(shè)置末端試水裝置等嚴(yán)重影響設(shè)備工程質(zhì)量的問題,這種做法的隱患就是直接導(dǎo)致設(shè)備安裝并投入使用后,無法保證正常消防用水量,或者真正發(fā)生火災(zāi)時(shí)水箱不能及時(shí)供水,貽誤消防滅火的時(shí)機(jī),造成不必要國家公共財(cái)產(chǎn)損失,甚至重大人員傷亡。

b)給水排水工程設(shè)備安裝質(zhì)量問題

現(xiàn)代建筑工程對給排水系統(tǒng)設(shè)備的消防供水可靠性、排水及時(shí)性以及防漏、防噪等方面提出了比過去更高的質(zhì)量和技術(shù)要求,常見的有室外排水與化糞池土建施工問題、管道試壓與沖洗問題、雨水系統(tǒng)堵塞問題和管道連接質(zhì)量和噪音問題。涉及到要求更為嚴(yán)格的高層建筑室內(nèi)采用防火卷簾代替防火墻時(shí),要保證其防火卷簾應(yīng)符合防火墻耐火極限的判定條件,按要求在防火卷簾兩側(cè)應(yīng)設(shè)閉式自動噴水滅火系統(tǒng),其噴頭間距不應(yīng)小于2米,而生活和消防合用高位水箱,應(yīng)有一定消防貯水量,實(shí)際工程中有很多情況下施工方都沒有做到。

c)電氣工程設(shè)備安裝質(zhì)量問題

配線工程的質(zhì)量安全關(guān)鍵在于所使用的支架、管卡、吊架等金屬附件的質(zhì)量以及敷設(shè)于各個(gè)部位的配管性能是否符合規(guī)范標(biāo)準(zhǔn)。對于超高層建筑內(nèi)的電力、照明、自控等線路應(yīng)特殊情況特殊處理,采用高阻燃型電線或電纜,重要消防設(shè)備(如消防泵、消防梯、防排煙風(fēng)機(jī)等)的供電線路,應(yīng)采用先進(jìn)的耐火型電纜和礦物絕緣電纜等,但實(shí)際上由于控制建筑設(shè)備成本等條件限制,工程中常出現(xiàn)以次充好的現(xiàn)象。

d)采暖通風(fēng)空調(diào)系統(tǒng)設(shè)備安裝質(zhì)量問題

采暖衛(wèi)生、通風(fēng)空調(diào)工程中要注意各類管道和支架的選材和非鍍鋅材料的使用,應(yīng)在做好防腐處理后,方可進(jìn)行安裝。對于容易出現(xiàn)技術(shù)問題的高層建筑,施工中應(yīng)保證的低壓流體焊接鋼管管道水壓符合對應(yīng)實(shí)際建筑高度標(biāo)準(zhǔn)。室內(nèi)采暖系統(tǒng)不得使用非鍍鋅鋼管,采暖及熱水管道活接頭,散熱器的襯墊應(yīng)使用符合標(biāo)準(zhǔn)要求的耐熱膠墊。工程中常出現(xiàn)通風(fēng)、空調(diào)風(fēng)管穿越防火分區(qū)和通風(fēng)、空調(diào)機(jī)房隔墻、樓板處,防火閥數(shù)量不滿足設(shè)計(jì)要求,或者未按標(biāo)準(zhǔn)單獨(dú)設(shè)吊架的問題。

e)建筑設(shè)備安裝質(zhì)量問題的產(chǎn)生原因

建筑工程設(shè)備安裝質(zhì)量問題的根源在于施工人員相關(guān)法規(guī)和消防意識以及專業(yè)技能欠缺和設(shè)備質(zhì)量良莠不齊兩方面。建筑施工過程中監(jiān)督管理單位對消防設(shè)備安裝工作監(jiān)管力度薄弱,和對火災(zāi)自動報(bào)警裝置中的玻璃探頭、自動噴淋滅火系統(tǒng)中的噴頭等消防設(shè)施的專門維護(hù)、消防給排水管道沖沙清理等日常工作麻痹大意;而隨著各地消防設(shè)備生產(chǎn)企業(yè)不斷研發(fā)或引進(jìn)了各種新型的給排水設(shè)備和管材,就難免在施工中發(fā)生以次充好,或者在不了解產(chǎn)品性能的情況下設(shè)計(jì)安裝不合理問題,未考慮設(shè)備的真實(shí)使用環(huán)境、可操作性和產(chǎn)品質(zhì)量,導(dǎo)致設(shè)備無法通過消防部門的檢測審查,根不能為人民生命財(cái)產(chǎn)安全提供有效保障。

三、建筑設(shè)備安裝質(zhì)量問題的防治方法

建筑各系統(tǒng)設(shè)備安裝中存在的以上現(xiàn)象,充分暴露出建筑工程施工建設(shè)過程中安裝、調(diào)試、裝飾裝修等方面不規(guī)范的操作、設(shè)備產(chǎn)品質(zhì)量無保障,高層消防、排水、電器系統(tǒng)總體功能不能滿足規(guī)范要求等眾多問題亟待解決的問題。因此企業(yè)和施工方都應(yīng)當(dāng)及時(shí)跟蹤建筑施工、設(shè)備安裝過程,堅(jiān)決杜絕建設(shè)、施工單位不按國家消防技術(shù)規(guī)范和經(jīng)批準(zhǔn)的施工圖紙施工、擅自降低技術(shù)和質(zhì)量標(biāo)準(zhǔn)要求、改變消防設(shè)計(jì)等原則性問題的發(fā)生,嚴(yán)厲整治建筑施工違規(guī)違章行為,防止埋下“人禍隱患”。要做好建筑設(shè)備安裝質(zhì)量問題的預(yù)防和治理具體有一下幾個(gè)方面的工作:

首先應(yīng)注重對施工從業(yè)人員進(jìn)行有關(guān)安全生產(chǎn)技術(shù)標(biāo)準(zhǔn)、施工現(xiàn)場安全操作等方面的培訓(xùn)。要制定切實(shí)可行的治理措施,突出質(zhì)量審點(diǎn),落實(shí)技術(shù)方法,講求工程實(shí)效,尤其要注意從設(shè)備采購的源頭抓起,杜絕以次充好,防止安全隱患的產(chǎn)生。其次要大力加強(qiáng)設(shè)備研究審查機(jī)構(gòu)的監(jiān)督和各項(xiàng)消防產(chǎn)品的實(shí)踐檢驗(yàn);安裝的機(jī)械設(shè)備、主要的或用于重要部位的材料,必須按設(shè)計(jì)規(guī)范,選擇符合國家標(biāo)準(zhǔn)的產(chǎn)品,并應(yīng)有合格證明;設(shè)備安裝中采用的各種計(jì)量和檢測儀器、儀表,應(yīng)符合國家現(xiàn)行計(jì)量法的規(guī)定,其精度等級,不應(yīng)低于被檢對象的精度等級。最后相關(guān)部門應(yīng)加強(qiáng)本地建筑設(shè)備工程施工現(xiàn)場的檢查工作。

四、結(jié)論

建筑工程設(shè)備安裝,是一項(xiàng)建筑工程施工和管理的重要組成部分,隨著高新科技帶來的各工程領(lǐng)域的設(shè)備不斷增多,建筑設(shè)備安裝也面臨越來越多技術(shù)上的機(jī)遇與挑戰(zhàn),也對設(shè)備安裝人員及監(jiān)管人員提出了更高的專業(yè)要求,為了保證工程質(zhì)量,所有業(yè)內(nèi)人士都應(yīng)通過不斷的學(xué)習(xí),提高自身的專業(yè)技術(shù)水平,使我國建筑設(shè)備工程向著更安全、更高效、更科學(xué)的方向前進(jìn)。

參考文獻(xiàn)

[1]田茂森. 關(guān)于智能建筑電氣設(shè)備系統(tǒng)安裝及質(zhì)量監(jiān)控之淺談[J]. 建材與裝飾:上旬, 2011, (7).

篇9

關(guān)鍵詞:大型住宅小區(qū);給排水綜合管網(wǎng)設(shè)計(jì);地下車庫

中圖分類號:TU991文獻(xiàn)標(biāo)識碼:A文章編號:1009-2374(2009)10-0052-02

一、概述

隨著國民經(jīng)濟(jì)的蓬勃發(fā)展、人們生活水平的不斷提高,家庭汽車的保有量也在迅速增加,住宅小區(qū)停車庫的規(guī)模也在迅速的加大,1:1的停車位甚至都不能滿足要求,由此造成小區(qū)建筑紅線內(nèi)地下車庫滿鋪。再加之人們對居住環(huán)境的要求越來越高,除了人車分流的基本要求外,小橋流水、鳥語花香已成為小區(qū)景觀建設(shè)的基本元素,車庫上部設(shè)計(jì)有大量的道路、綠化、水景等。而且大型小區(qū)的設(shè)備用房往往面積大,布置復(fù)雜,且絕大部分都設(shè)置在地下。

上述種種原因都使得居住區(qū)地下停車庫的面積大型化、功能多樣化、布置復(fù)雜化成為小區(qū)建設(shè)的必然趨勢。由此給大型居住區(qū)的給排水、雨水、消防等總體管網(wǎng)設(shè)計(jì)也帶來了很多新的問題。

現(xiàn)筆者結(jié)合曾參與設(shè)計(jì)的某小區(qū)的給排水設(shè)計(jì)實(shí)例,對大型住宅小區(qū)的室外管網(wǎng)的設(shè)計(jì)以及設(shè)計(jì)中遇到的一些實(shí)際問題進(jìn)行闡述。

二、小區(qū)的總體特點(diǎn)

(一)地下車庫的建筑面積大,連接關(guān)系復(fù)雜

該小區(qū)由9幢小高層住宅、10幢洋房、15幢別墅商業(yè)裙房、會所、物業(yè)用房、幼兒園及地下車庫等組成,建筑規(guī)劃建設(shè)用地約為8萬平方米。小區(qū)總建筑面積約28萬m2,分兩期建設(shè),筆者參與了二期設(shè)計(jì)。

小區(qū)9幢小高層住宅、10幢洋房,全部坐落在小區(qū)地下室上部,15幢別墅在地下室外,建筑物的分布是:靠江邊的是別墅區(qū),接著是洋房,然后是小高住宅。小區(qū)內(nèi)地下室為汽車庫和設(shè)備用房。

(二)管線多,規(guī)格大,系統(tǒng)復(fù)雜、敷設(shè)難度大

由于甲方為降低工程造價(jià)、便于后期管理,要求將小區(qū)內(nèi)的所有供水、消防、動力、電力設(shè)備均集中設(shè)置在小區(qū)地下一層的設(shè)備用房內(nèi),這樣勢必造成小區(qū)總體管網(wǎng)多,管徑大,管道復(fù)雜。且車庫頂板上覆土深度有限,僅為1.2米,小區(qū)內(nèi)設(shè)有水景、園建等景觀管道,還有暖通專業(yè)的部分管溝,空間非常緊張。

因此把所有管道都設(shè)置在覆土層是不現(xiàn)實(shí)的。為方便施工和后期管理,將壓力管線均敷設(shè)在地下車庫內(nèi)。

三、給排水綜合管網(wǎng)的設(shè)計(jì)要點(diǎn)

(一)給水、熱水、消防等有壓管道均設(shè)于地下車庫頂板下

本小區(qū)地下車庫層高3.6米,扣除800mm的大梁(人防的部分地方還有1.0米的大梁),大部分地方凈高只有2.8m,而甲方為降低土建造價(jià),不愿意再加大車庫的凈高,為滿足規(guī)范和使用要求,留給設(shè)備專業(yè)的布管空間就相對較小。而暖通專業(yè)的地下車庫風(fēng)管、住宅的給水及消防管道、電氣專業(yè)的電纜橋架都要設(shè)置在車庫頂板下,這就要求我們在管線布置時(shí)要統(tǒng)一協(xié)調(diào),盡量避免交叉。經(jīng)過水、暖、電三個(gè)專業(yè)的協(xié)商配合,最終決定:因水專業(yè)進(jìn)單體管道較多,管道走車庫周邊最,可就近接入單體;其次是暖通管道和電氣橋架。

本著一個(gè)大原則:小管讓大管,有壓讓無壓,從而保證了地下車庫的使用高度。

(二)市政給水管道設(shè)于車庫頂覆土層內(nèi)

本小區(qū)市政給水管道為兩路進(jìn)水,繞小區(qū)成環(huán)并在其上設(shè)置室外消火栓,將水供至地下室貯水池,并且在小區(qū)環(huán)狀管網(wǎng)上還應(yīng)考慮布置室外消火栓以及綠化澆灑用水的灑水栓。由于商業(yè)用水與生活用水的計(jì)量方式不同,在市政管網(wǎng)單獨(dú)設(shè)置一塊水表引至各個(gè)商業(yè)用水點(diǎn)。鑒于以上兩種管道與地下車庫以及各個(gè)單體的聯(lián)系不大,且主要用于室外給水及消防,為了盡量減少地下車庫的安裝難度,將上述兩種管道設(shè)于地下室頂覆土層內(nèi),并盡量設(shè)于綠地下部,可盡量避免上部荷載對管道的影響。

(三)污水管道優(yōu)先布置,并與其他管道全盤考慮;化糞池分散布置

按照城市排水體制,室外污水和雨水為分流制排水系統(tǒng),生活污水均經(jīng)化糞池處理后排至市政污水管道。

由于污水管道數(shù)量多,連接復(fù)雜,且為重力流,必須優(yōu)先布置。當(dāng)然,優(yōu)先布置并不是說就不考慮其它管道管線。我們最早在進(jìn)行每個(gè)單體的設(shè)計(jì)時(shí),水專業(yè)就與建筑專業(yè)及其它專業(yè)密切配合,根據(jù)室外總體與各棟單體的具體情況,確定單體的給排水與其它專業(yè)管道的進(jìn)出口位置,做到排水管道與其它專業(yè)管道在室外均能避開,尤其在室外總體做到管道不沖突,不交叉,這樣就可充分利用覆土層的有限高度,將所有管道合理有效的布置。

由于本小區(qū)占地面積大、使用人數(shù)多,管線關(guān)系復(fù)雜,若是集中設(shè)置化糞池,將會占用很大的地下面積,且要增加大量的排水管道,對排水系統(tǒng)不利,同時(shí)也增加了以后維護(hù)工作的難度??紤]本小區(qū)的東西兩邊均為市政道路,且與小區(qū)同時(shí)施工建設(shè),經(jīng)與市政部門協(xié)商,在道路施工過程中為本小區(qū)預(yù)留了五個(gè)污水排放井供本小區(qū)污水排放。因此在室外根據(jù)具置,利用單體周圍無地下室的空地處分散布置了五個(gè)化糞池,將小區(qū)污水分散排放,避免了在中央車庫頂布置大量排水管道,從而進(jìn)一步減少了各種管道的交叉。

(四)雨水設(shè)計(jì)采用暗溝與管道結(jié)合方式收集排放

前面我們已經(jīng)提到覆土層的深度非常有限,且覆土層內(nèi)有很多管道,如果雨水也按常規(guī)的檢查井、雨水管方式設(shè)置,那么雨水管道也要設(shè)于覆土層內(nèi),一旦雨水管道與排水管道相碰,將沒有足夠的高度讓兩種管道避開。通過與建筑專業(yè)以及景觀專業(yè)的協(xié)商,決定地下室車庫頂?shù)挠晁捎冒禍吓潘?溝寬300mm,以便于清通維護(hù),坡度0.004,在暗溝上間隔適當(dāng)?shù)木嚯x設(shè)置雨水篦子收集雨水。在車庫范圍外和別墅區(qū)設(shè)置雨水檢查井,將雨水暗溝排水改為雨水管道排水。在道路及單體周圍按照常規(guī)設(shè)置雨水篦子收集雨水。

小區(qū)地面雨水采用就地入滲和雨水滲管方式。

與污水管道同樣,市政也為本小區(qū)預(yù)留了四個(gè)雨水排放井供本小區(qū)雨水排放。因此將小區(qū)雨水分散排放,盡量可能多的避免了雨水管道與污水管道的交叉,減少了管道的敷設(shè)深度,降低了工程造價(jià)。

四、結(jié)語

建筑設(shè)計(jì)作為一個(gè)整體的工程,是各個(gè)專業(yè)協(xié)作的結(jié)果,有些方案在本專業(yè)的角度看起來好一些,但對工程整體的影響就不一定如此??梢哉f,一個(gè)工程各專業(yè)協(xié)同度越高,它的整體效果就越好。合作與協(xié)同的藝術(shù)對給排水工程師至關(guān)重要。給水排水設(shè)計(jì)中,往往受場地和標(biāo)高的限制而需要考慮管線的相互避讓和調(diào)整,這是小區(qū)室外給排水設(shè)計(jì)中的難題。作為設(shè)計(jì)人員,我們按照國家規(guī)范設(shè)計(jì),服務(wù)于甲方,服務(wù)于業(yè)主,向他們提供優(yōu)良的服務(wù)是我們的職責(zé)。因此,在設(shè)計(jì)前,我們必須明了他們的要求和意圖,以便在確定方案時(shí)根據(jù)他們合理的愿望和要求來決定我們的取舍,這就要求我們設(shè)計(jì)之前不僅僅只收集技術(shù)資料,還要充分聽取甲方的意見和要求,并在設(shè)計(jì)中盡可能予以滿足。

篇10

一、編制依據(jù)

《人民防空地下室設(shè)計(jì)規(guī)范》GB50038-2005;

《人民防空工程設(shè)計(jì)防空規(guī)范》GB50098-2009

《人民防空工程防化設(shè)計(jì)規(guī)范》RF

J013-2010

《自動噴水滅火系統(tǒng)設(shè)計(jì)規(guī)范》GB50084-2001(2005版)

《汽車庫,修車庫,停車場設(shè)計(jì)防火規(guī)范》GB50067-97

《建筑滅火器配置設(shè)計(jì)規(guī)范》GB50140-2005

《建筑設(shè)計(jì)防火規(guī)范》50016-2014

《建筑給水排水設(shè)計(jì)規(guī)范》GB50015-2003.(2009版)

《消防給水及消火栓系統(tǒng)技術(shù)規(guī)范》GB50974-2014

《泡沫滅火設(shè)計(jì)規(guī)范》GB50151-2010

二、工程概況

工程名稱:中交(青島)順河片區(qū)城鎮(zhèn)化建設(shè)項(xiàng)目6#地塊人防工程

結(jié)構(gòu)形式:框剪結(jié)構(gòu)

建筑面積:人防建筑面積為31030㎡。

本人防工程為甲類核(常)六級防化等級,按照平戰(zhàn)結(jié)合的原則設(shè)計(jì),

平時(shí)為地下停車場,戰(zhàn)時(shí)用途為物資儲備庫,劃分防護(hù)單元。人防區(qū)設(shè)置在地下一層,

人防結(jié)構(gòu)頂板絕大多數(shù)低于室外地面,局部高于室外地面。

給水系統(tǒng):

1.水源:防空地下室戰(zhàn)時(shí)由市政管網(wǎng)供給。

2.防空地下室每個(gè)物資庫防護(hù)單元內(nèi)設(shè)置人防水箱。供物資搬運(yùn)過程洗手用。

3.防空地下室的防毒通道內(nèi)及密閉通道設(shè)置皮帶沖洗龍頭.

排水系統(tǒng)

1.人防地下室戰(zhàn)時(shí)利用平時(shí)集水坑及其排水管道排出戰(zhàn)時(shí)生活污水,污水泵平時(shí)戰(zhàn)時(shí)均適用。

2.隔絕防護(hù)時(shí)間內(nèi),人防地下室不得向外部排水。

3.人防地下室戰(zhàn)時(shí)主要出入口防護(hù)門外的通道內(nèi),設(shè)置染毒水池,防毒通道及各密閉通道則設(shè)置防爆地漏將洗消廢水排至染毒水池。

防護(hù)設(shè)施

穿越防護(hù)外墻及頂板的所有給排水管道,必須于防護(hù)外墻及頂板的內(nèi)側(cè)設(shè)置公稱壓力1.0MPa的銅芯閘閥作為防爆波閥,穿外墻及頂板處須作專用的防爆套管,在剛性防水套管基礎(chǔ)上焊接,10厚200寬的擋板環(huán),做法見大樣。其他部位則設(shè)剛性密閉套管,詳04FS02。

閥邊緣距墻面或頂板內(nèi)側(cè)的距離不大于200mm。

管材

給水管采用鋼塑復(fù)合管,壓力排水管采用熱鍍鋅鋼管,埋地排水管采用排水鑄鐵管或熱鍍鋅鋼管。

其他

1.

與戰(zhàn)時(shí)無關(guān)的所有排水管道一律不得進(jìn)入防空地下室。

2.

本人防工程的給水引入管、排水出戶管和防爆波地漏均須在工程施工、安裝時(shí)一次完成.

3.

標(biāo)高以首層室內(nèi)地面為±0.000計(jì)。

4.

尺寸單位:標(biāo)高以米計(jì),其它均以毫米計(jì)。

5.

管道標(biāo)高法:圖中所注標(biāo)高,壓力管道標(biāo)高均為管中心標(biāo)高,重力管為管內(nèi)底標(biāo)高。

6.

為人防區(qū)預(yù)留的給排水進(jìn)出水管從外到內(nèi)施工到防爆波閥,并應(yīng)有明顯標(biāo)志。

7.

人防區(qū)域內(nèi)所有閥門均采用防爆閥門,防爆閥門安裝詳見GB04SF02。

8.

手搖泵、潛污泵、柔(剛)性密閉套管、水箱基礎(chǔ)及固定安裝詳GB04FS02。

室內(nèi)排水系統(tǒng)為:中水系統(tǒng)、熱水系統(tǒng)、生活污水排水系統(tǒng)、雨水排水系統(tǒng)、生活廢水排水系統(tǒng)。

生活污水系統(tǒng)分為自流排及強(qiáng)排:一層以上污水廢水自流排至室外;

地下壓力排水本工程:室內(nèi)排水采用污廢采用合流制。地上部分的污廢水重力自留排入室外檢查井,地下室污廢水采用潛污泵提升至室外檢查井。每個(gè)污廢水集水池內(nèi)均設(shè)置兩臺潛污泵,液位控制開啟,交替運(yùn)行。其安裝按設(shè)計(jì)圖紙規(guī)范進(jìn)行安裝,對產(chǎn)品質(zhì)量進(jìn)行檢查,進(jìn)場產(chǎn)品備有質(zhì)量合格證等相應(yīng)質(zhì)量保證性文件,潛污泵的壓力排水管道采用熱鍍鋅管絲接。穿越防護(hù)分區(qū)的壓力排水管在防護(hù)區(qū)內(nèi)側(cè)安裝抗力>1.0MPa的防護(hù)閥門,各抗力>1.0MPa的閥門均設(shè)有明顯的啟閉標(biāo)志,且防護(hù)閥門應(yīng)滿足工作壓力下的承壓要求。管材選用:穿越防護(hù)區(qū)的壓力排水管采用熱鍍鋅鋼管,絲接或法蘭及管箍連接。壓力排水管道上的閥門采用銅芯球磨鑄鐵外殼閘閥,耐壓不小于1.0MPa。潛污泵出水管采用立式排水止回閥。管道穿越鋼筋混凝土墻,樓板,梁時(shí)應(yīng)根據(jù)圖中所標(biāo)注的管道標(biāo)高,位置配合土建施工預(yù)留孔洞或預(yù)埋套管,管道穿越地下室外墻,人

防防護(hù)結(jié)構(gòu)時(shí),應(yīng)按人防工程標(biāo)準(zhǔn)預(yù)埋防水套管。

三、施工準(zhǔn)備

1、臨時(shí)設(shè)施

根據(jù)現(xiàn)有的臨時(shí)的設(shè)施安排好人工的臨時(shí)宿舍,選擇好堆放材料與工具的倉庫,按照現(xiàn)場電工的要求接好臨時(shí)機(jī)械的用電。

2、勞動力安排

根據(jù)土建施工進(jìn)度要求,合理安排的人員進(jìn)場施工。

3、技術(shù)準(zhǔn)備

①、認(rèn)真學(xué)習(xí)、熟悉施工圖紙理解設(shè)計(jì)的意圖、搞好圖紙會審。

②、編制施工方案和施工操作要點(diǎn),對可能出現(xiàn)問題的部位和工序提出注意事項(xiàng)和措施,對關(guān)鍵工序有專門的單項(xiàng)施工方案。

③、由公司工程部進(jìn)行技術(shù)交底、圖紙交底、施工組織設(shè)計(jì)交底、設(shè)計(jì)變更和洽商交底、分項(xiàng)工程技術(shù)交底,以明確施工意圖,克服質(zhì)量通病,確保工程優(yōu)良。

④、組織現(xiàn)場施工人員學(xué)習(xí)工程質(zhì)量驗(yàn)收規(guī)范及ISO9001:2000

質(zhì)量體系標(biāo)準(zhǔn)與作業(yè)指導(dǎo)書,實(shí)行專業(yè)技術(shù)培訓(xùn),全面掌握、熟

悉安裝工程質(zhì)量檢驗(yàn)評定標(biāo)準(zhǔn)。

⑤、建立各種規(guī)章制度、材料管理制度、安全責(zé)任制、施工現(xiàn)場用水用電安全制度、衛(wèi)生值勤制度、出勤考核制度。

、對工人崗前進(jìn)行安全教育與安全交底。

⑦、材料設(shè)備進(jìn)場要有資質(zhì)的生產(chǎn)廠家的資質(zhì)報(bào)告、檢測報(bào)告、材質(zhì)單、合格證、進(jìn)市準(zhǔn)用證(市人防站備案);

⑧、防爆地漏、防爆清掃口、防爆波閥門用國家人防部門備案并取得準(zhǔn)用證的生產(chǎn)廠家生產(chǎn)的,三證齊全。

四、主要施工方法與技術(shù)措施

(一)、給水排水工程施工流程圖

給水排水工程施工流程如圖所示。

給水排水工程施工流程圖

施工準(zhǔn)備

閥門試壓

支架預(yù)制

設(shè)備安裝

管道預(yù)制

支架安裝

管道安裝

閉水試驗(yàn)

單機(jī)試運(yùn)轉(zhuǎn)

試壓

防腐油漆

通水沖洗

交工驗(yàn)收

(二)、給水排水工程施工方法及技術(shù)措施

(1)給水管道的安裝

本工程室內(nèi)

給水及中水主管及立管采用鋼塑復(fù)合管,≤DN80采用絲扣連接,>DN80采用溝槽連接,供水接市政給水管網(wǎng),給水管主管貼梁底安裝,穿越人防人防圍護(hù)結(jié)構(gòu)時(shí)在人防側(cè)墻內(nèi)側(cè)設(shè)置銅心閘閥,穿越防護(hù)單元隔墻時(shí)在隔墻兩側(cè)均設(shè)置銅心閘閥;

1、工藝流程

安裝準(zhǔn)備預(yù)制加工干管安裝立管安裝支管安裝管道沖洗、試壓

2、安裝準(zhǔn)備

熟悉圖紙,參看有關(guān)專業(yè)設(shè)備圖和建筑裝修圖,核對各種管道的坐標(biāo)、標(biāo)高是否有交叉,管道排列所用空間是否合理。有問題及時(shí)與設(shè)計(jì)、甲方和監(jiān)理研究解決,辦好變更洽商記錄。

3、預(yù)制加工

按設(shè)計(jì)圖紙畫出管道分路、管徑、變徑、預(yù)留管口,閥門位置等施工草圖,在實(shí)際安裝的結(jié)構(gòu)位置做上標(biāo)記,按標(biāo)記分段量出實(shí)際安裝的準(zhǔn)確尺寸,記錄在施工草圖上,然后按草圖測得的尺寸預(yù)制加工,按管段分組編號。所有閥門必須經(jīng)過試壓合格才能使用。

4、干管的安裝

A.下料:內(nèi)筋嵌入式襯塑鋼管采用鋼鋸或?qū)S们泄芷鲾喙堋?/p>

B.管道安裝要求每米偏差≤1mm,全長偏差≤10mm。

C.管道支吊架:管道支吊架選用角鋼現(xiàn)場加工制作。支吊架制作集中在加工場進(jìn)行,以方便控制支架的制作質(zhì)量。加工時(shí)要求用砂輪切割機(jī)西下料。支架的膨脹螺栓孔要用鉆床鉆孔,不能用氧割開孔。

支吊架連接采用焊接方法,焊接要求應(yīng)符合焊接的質(zhì)量標(biāo)準(zhǔn)。支吊架制作好后要進(jìn)行除銹和刷漆處理并按要求刷面漆。管道用U

形管卡固定在支吊架上,或用專用吊卡,內(nèi)筋嵌入式襯塑鋼管管道與支吊架及管卡接觸處,必須用橡膠墊或者枕木隔離。

5.支管安裝

支管安裝,采用專用管件連接。

(1)支管明裝:將預(yù)制好的支管從主管甩口依次逐段進(jìn)行安裝,根據(jù)管道長度適當(dāng)加好臨時(shí)固定卡,核定不同衛(wèi)生器具的給水預(yù)留口高度、位置是否正確、找平找正后栽支管卡件,去掉臨時(shí)固定卡,上好臨時(shí)絲堵。

(2)支管暗裝:確定支管高度后畫線定位,剔出管槽,將預(yù)制好的支管敷在槽內(nèi),找平找正定位后用勾釘固定。衛(wèi)生器具的給水預(yù)留口要做在明處,加好絲堵。

6.管道試壓

管道系統(tǒng)安裝完后進(jìn)行綜合水壓試驗(yàn)。管道系統(tǒng)試壓分區(qū)進(jìn)行,給水管道系統(tǒng)試驗(yàn)壓力應(yīng)為工作壓力的1.5

倍,但不得小于0.6MPa。本工程給水干管管道試驗(yàn)壓力為1.75MP。

檢驗(yàn)方法:金屬及復(fù)合管給水管道系統(tǒng)在試驗(yàn)壓力下觀測10min,壓力降不應(yīng)大于0.02MPa,然后降到工作壓力進(jìn)行檢查應(yīng)不滲不漏,為合格。

7.管道沖洗、通水試驗(yàn)

管道在試壓完成后即可做沖洗,沖洗應(yīng)用自來水連續(xù)進(jìn)行,應(yīng)保證有充足的流量。沖洗潔凈后辦理驗(yàn)收手續(xù)。

給水系統(tǒng)交付使用前必須進(jìn)行通水試驗(yàn),開啟閥門水嘴等放水,觀察放水情況,并做好記錄。

(2)、排水管道的安裝

地下室埋地管采用鑄鐵管或熱鍍鋅鋼管,橡膠圈承插連接和焊接;

焊接,內(nèi)外浸瀝青兩遍。溢、泄水管采用鍍鋅鋼管,絲扣或法蘭連接。

1.工藝流程

安裝準(zhǔn)備管道預(yù)制污水、雨水安裝污水、雨水支管安裝灌水試驗(yàn)

2.安裝準(zhǔn)備

根據(jù)設(shè)計(jì)圖紙及技術(shù)交底,檢查、核對預(yù)留孔洞大小尺寸是否正確,將管道坐標(biāo)、標(biāo)高位置畫線定位。防水套管位置正確,是否需要加筋固定。

3.集水坑立管安裝

A.立管檢查口設(shè)置按設(shè)計(jì)要求。

B.安裝立管應(yīng)二人上下配合,一人在上一層樓板上,由管洞內(nèi)投下一個(gè)繩頭,下面一人將預(yù)制好的立管上半部拴牢,上拉下托將立管對中下層管口,下層的人把甩口及立管檢查口方向找正,加密封圈上卡箍,復(fù)查立管垂直度,將立管固定牢固,用密封油膏封堵。

C.密閉鋼套管在起主體時(shí)按標(biāo)準(zhǔn)尺寸做預(yù)留鋼套管,按照國家人防圖集標(biāo)準(zhǔn)制作,根據(jù)設(shè)計(jì)圖紙位置預(yù)留樓板內(nèi),待施工時(shí),從此套管穿過,管材與套管之間用人防標(biāo)準(zhǔn)封堵。

(三)防爆地漏及地埋排水管安裝

防爆地漏型號為DN80,安裝高度嚴(yán)格按規(guī)范操作,地漏上平面低于地面5-10毫米,保證室內(nèi)排水暢通無積水,在覆土墊層內(nèi)敷設(shè),人防排水管連接具體操作步驟;(1)、室外及戶內(nèi)房心回填土回填完成并夯實(shí)后再人工開挖排水管溝,確保溝底坡度符合設(shè)計(jì)及規(guī)范要求。(2)、管道安裝前必須對管溝的標(biāo)高、坡度進(jìn)行復(fù)測,并先定出節(jié)點(diǎn)和構(gòu)筑物的位置。(3)、連續(xù)下管鋪設(shè)時(shí),必須保證管道與管道之間接口的環(huán)形空隙均勻一致,其管道四周任何一點(diǎn)的間隙應(yīng)符合質(zhì)量標(biāo)準(zhǔn)

(4)、

防爆地漏采用熱鍍鋅管絲扣連接,連接填料采用白漆麻絲,然后刷防銹漆在連接處,再刷一道黑油。地漏口部周圍采取加固措施;孔口采用輕質(zhì)填料封閉。保證其在回填及澆筑混凝土?xí)r管道位置不偏移。

(5)、排水管為使用通暢。

表5.3.3

地下埋設(shè)雨水排水管道的最小坡度

項(xiàng)次

管徑(MM)

最小坡度(%)

1

50

2

2

75

1.5

3

100

0.8

4

125

0.6

5

150

0.5

檢驗(yàn)方法;水平尺、拉線尺量檢查

(四)

管道穿越非人防外墻時(shí)設(shè)置剛性防水套管,根據(jù)國標(biāo)02S404(P15),A型規(guī)范制作;

詳見下圖:

2、穿越人防頂板、外墻、密閉隔墻、臨空墻及防護(hù)單元之間的防護(hù)密閉隔墻時(shí)設(shè)置防護(hù)密閉套管,根據(jù)國標(biāo)07FS02,B型規(guī)范制作安裝;管道穿越防火墻時(shí),要求用不燃材料緊密填實(shí)。

見下圖:

(五)灌水試驗(yàn)

1.污水管道安裝后,按規(guī)定要求進(jìn)行閉水試驗(yàn),凡屬隱蔽暗裝管道必須按分項(xiàng)工序進(jìn)行,衛(wèi)生潔具及設(shè)備安裝后,必須進(jìn)行通水試驗(yàn)。檢驗(yàn)方法:滿水15min

,水面下降后再灌滿觀察5min,液面不降,管道及接口無滲漏為合格。

2.排水主立管及水平干管管道均應(yīng)做通球試驗(yàn),通球球徑不小于排水管道管徑的2/3,通球率必須達(dá)到100%。

五.質(zhì)量要求

(一)質(zhì)量控制注意事項(xiàng)

1、施工前應(yīng)認(rèn)真熟悉圖紙,按照設(shè)計(jì)圖紙,規(guī)范圖冊,結(jié)合本方案和計(jì)術(shù)交底,明確各種管道的做法和要求,保證工程質(zhì)量。

2、于其他專業(yè)密切配合,凡需剔鑿的部位應(yīng)在土建裝修前完成,剔洞尺寸及須斷筋處嚴(yán)格執(zhí)行有關(guān)規(guī)范,須辦理手續(xù)的及時(shí)辦理。

3、每個(gè)分項(xiàng)工程施工前,工長組織人員根據(jù)圖紙及本方案有關(guān)要求,結(jié)合現(xiàn)場實(shí)際情況,進(jìn)行交底,杜絕盲目施工。

4、堅(jiān)持按圖紙施工,認(rèn)真按照工藝要求操作,對同類項(xiàng)目應(yīng)做樣板間,樣板項(xiàng),經(jīng)檢查合格后再大面積施工。

5、對操作者貫徹質(zhì)量全面負(fù)責(zé)方針,施工班組認(rèn)真執(zhí)行自檢、互檢,使工程質(zhì)量牢固建立在班組的基礎(chǔ)上。

6、質(zhì)檢人員堅(jiān)持質(zhì)量評定標(biāo)準(zhǔn),不姑息遷就,把問題消滅在萌芽狀態(tài),配合全體施工人員,管理人員確保工程質(zhì)量。

7、施工班組對各種設(shè)備、管道的甩口、坐標(biāo)、標(biāo)高隨時(shí)復(fù)核,凡超出規(guī)范要求應(yīng)及時(shí)修復(fù)。對所有管道施工中斷及甩口處必須做到及時(shí)封堵,防止雜物進(jìn)入管道。

8、材料、設(shè)備的加工訂貨要嚴(yán)把質(zhì)量關(guān)。訂貨應(yīng)有書面文字質(zhì)量要求,對進(jìn)場的設(shè)備、材料、器具及配件和加工產(chǎn)品等及時(shí)進(jìn)行檢查驗(yàn)收,收集產(chǎn)品,達(dá)不到質(zhì)量標(biāo)準(zhǔn)的提出復(fù)核,

否則不得安裝。

9、施工用機(jī)具達(dá)到完好,

保證工程質(zhì)量和生產(chǎn)進(jìn)度。

(二)施工質(zhì)量標(biāo)準(zhǔn)

1、給水管道和閥門安裝允許偏差和檢驗(yàn)方法:

序號

項(xiàng)目

允許偏差(mm)

檢驗(yàn)方法

1

水平管道縱橫方向彎曲

每米

1

水平尺、直尺、拉線和尺量檢查

2

立管垂直度

每米

2

吊線和尺量檢查

3

成排管段和成排閥門

在同一平面上間距

3

尺量檢查

2、排水管道安裝允許偏差和檢驗(yàn)方法

序號

項(xiàng)目

允許偏差(mm)

檢驗(yàn)方法

1

座標(biāo)

15

2

標(biāo)高

±15

3

橫管道縱橫方向彎曲

每1m全長(25m以上)

1.5≯38

4

立管垂直度

每1m全長(25m以上)

3≯15

(三)質(zhì)量控制

1、隱蔽工程應(yīng)在隱蔽前經(jīng)驗(yàn)收,各方檢驗(yàn)合格后,才能隱蔽,并完成記錄。

2、地下室或地下構(gòu)筑物外墻有管道穿過,應(yīng)采取防水措施。對有嚴(yán)格要求的建筑物,必須采取柔性防水管道。

3、管道穿過結(jié)構(gòu)伸縮縫、抗震縫及沉降縫敷設(shè)時(shí),在墻體兩側(cè)采取柔性連接。

4、在同一房間內(nèi),同類型的暖通設(shè)備、衛(wèi)生器具及管道配件,除有特殊要求外,應(yīng)安裝在同一高度。

5、明裝管道成排安裝時(shí),直線部分應(yīng)互相平行。曲線部分:當(dāng)管道水平或垂直并行時(shí),應(yīng)與直線部分保持等距;管道水平上下并行時(shí),彎管部分的曲率半徑應(yīng)一致。

6、管道支、吊、托架的安裝:1)位置正確,埋設(shè)應(yīng)平整牢固。2)固定支架與管道接觸緊密,牢固可靠。3)滑動支架應(yīng)靈活,滑托與滑槽兩側(cè)間應(yīng)留有3-5mm的間隙,縱向移動量應(yīng)符合設(shè)計(jì)要求。4)無熱深長管道的吊架、吊干應(yīng)垂直安裝。5)熱深長管道的吊架、吊干應(yīng)向熱膨脹的反方向偏移。6)固定在建筑結(jié)構(gòu)上的管道支、吊架不得影響結(jié)構(gòu)的安全。

7、鋼管管道與吊架的最大間距

公稱直徑(mm)

15

20

25

32

40

50

70

80

100

125

150

200

支架的最大間距(m)

保溫管

2

2.5

2.5

2.5

3

3

4

4

4.5

6

7

7

不保溫管

2.5

3

3.5

4

4.5

5

6

6

6.5

7

8

9.5

8、給水系統(tǒng)的金屬管道立管管卡安裝應(yīng)符合下列規(guī)定:

(1)樓層高度小于或等于5m,每層必須安裝1個(gè)。

(2)樓層高度大于5m,每層不得少于2個(gè)。

(3)管卡安裝高度,距地面應(yīng)為1.5m-1.8m,2個(gè)上管卡應(yīng)均勻安裝,同一房間管卡安裝在同一高度。

9、彎制鋼管的沖壓彎頭彎曲半徑應(yīng)不小于管徑的外徑。焊接彎頭應(yīng)不小于管道外徑的1.5倍。

10、管道接口應(yīng)符合下列規(guī)定:

(1)采用橡膠圈接口的管道,允許沿曲線敷設(shè),每個(gè)接口最大偏移角不得超過2°。

(2)法蘭連接時(shí)襯墊不得凸入管道內(nèi),其外邊緣接近螺栓孔為宜,不得安放雙墊或偏墊。

(3)連接法蘭的螺栓,直徑和長度應(yīng)符合標(biāo)準(zhǔn),擰緊后,突出螺母的長度不應(yīng)大于螺桿直徑的1/2。

(4)螺紋連接管道安裝后的管螺紋根部應(yīng)有2-3扣的外露螺紋,多余的麻絲應(yīng)清理干凈并做好防腐處理。

(5)卡箍(套)式連接兩管口端應(yīng)平整,無縫隙,溝槽應(yīng)均勻??ňo栓后管道應(yīng)平直,卡箍(套)安裝方向應(yīng)一致。

11、各種承壓管道系統(tǒng)和設(shè)備應(yīng)做水壓試驗(yàn),外承壓管道系統(tǒng)和設(shè)備應(yīng)做灌水試驗(yàn)。

七、冬雨季施工措施

1、冬季一般不做試壓工作,如工程較緊必須試壓時(shí),應(yīng)采取防凍措施。試壓完畢立即將管道內(nèi)水排放干凈,以免凍裂管道和設(shè)備。

2、雨期應(yīng)避開雨天做室外挖溝、槽工作,確屬需要時(shí)做好防雨水和防塌方措施。

3、雨、雪、大風(fēng)、大霧天氣一般不安排露天作業(yè)或登高作業(yè),更不準(zhǔn)露天接電和使用電氣焊施工。

八、成品保護(hù)

1、加強(qiáng)對施工人員思想教育工作,提高施工人員成品保護(hù)意識。

2、預(yù)制加工好的鋼管絲頭,應(yīng)加管箍或用水泥袋、塑料布等將絲頭包好后存放,以免絲扣碰壞或生銹。預(yù)制好的管道,分項(xiàng)編號,碼放整齊,不得大管壓小管,并防止腳踏、物砸。

3、管道刷漆前必須清理除銹,待處理干凈后刷漆。

4、分類物品分類擺放,碼放整齊

5、安裝好的管道不得用作支撐點(diǎn)或錨固點(diǎn),不得踏壓、碰撞,其支托卡架不得作用其他用途受力。

6、預(yù)留管口應(yīng)加封堵,防止雜物進(jìn)入造成堵塞。

7、土建或其他工種施工時(shí),應(yīng)對管道、設(shè)備采取保護(hù)措施防止污染或損壞。

8、閥門手輪、水表、水龍頭等易損、易丟配件,在交工前統(tǒng)一裝好。

9、埋設(shè)管道時(shí)應(yīng)采用細(xì)土將管道覆蓋20cm以上,用木夯夯實(shí),嚴(yán)禁使用機(jī)械夯。

10、施工中注意本工種和其他工種的成品保護(hù),不得碰撞、污染。墻面、門等,不得在成品地面、樓梯上拖拉設(shè)備及管材。

11、通水試驗(yàn)前檢查管道并關(guān)閉所有閥門,分區(qū)、分段、分層進(jìn)行。先試干管、立管然后支管調(diào)試,防止跑水、漏水,損壞成品。

九、環(huán)境保護(hù)

1、施工現(xiàn)場遵守控制噪音的有關(guān)規(guī)定。

2、廢舊料要及時(shí)集中分揀和清理、回收和利用,嚴(yán)禁亂扔,做活完料凈腳下清。

3、節(jié)約用電、用水,杜絕長明燈和長流水。

十、安全文明施工

(一)認(rèn)真貫徹“安全第一,預(yù)防為主”的方針,明確安全生產(chǎn)、消防安全責(zé)任制。

(二)進(jìn)入施工現(xiàn)場,必須遵守施工現(xiàn)場安全管理制度和其他管理制度,戴好安全帽,嚴(yán)禁吸煙。

(三)每日施工前,班組長或施工負(fù)責(zé)人根據(jù)當(dāng)天施工特點(diǎn)做好口頭安全和消防技術(shù)交底,并填寫“班前安全講話記錄”。

(四)工作中精神集中,不嬉戲打鬧,每項(xiàng)工作應(yīng)遵守相關(guān)的安全操作規(guī)程,違者予以停工。

(五)注意施工現(xiàn)場各種安全標(biāo)志。

(六)電焊、氣焊注意事項(xiàng):

1、施焊必須申請用火證,并有專人看火和防火設(shè)施,持證上崗。

2、隱蔽部位施焊時(shí),注意周圍易燃易爆品,施焊完畢檢查現(xiàn)場及周圍確認(rèn)無隱患后方可離去。

3、嚴(yán)格遵守焊機(jī)施工的操作規(guī)程,接拆電焊機(jī)有專業(yè)人員操作。每臺電焊機(jī)必須裝有觸電保護(hù)器。電焊機(jī)接線端應(yīng)有可靠的防護(hù)罩,焊把與把線焊機(jī)連接牢固,雙線到位,無破損,絕緣良好。

4、注意電焊機(jī)與氣焊同時(shí)施工的距離,焊帶與把線分開,氣焊設(shè)備的安全附件齊全有效,氣瓶完好無損,兩瓶間距符合要求。

5、成立義務(wù)消防隊(duì)設(shè)專人負(fù)責(zé)。

(七)施工機(jī)械必須絕緣良好,定期檢查和檢測,及時(shí)保養(yǎng)。

(八)砂輪鋸必須裝設(shè)有不小于180度的防護(hù)罩和牢固的工作托架,嚴(yán)禁使用有缺口、裂紋和磨損,剩余部分小于25mm的砂輪片。

(九)對新產(chǎn)品、新工藝、新材料、新設(shè)備、新科技,必須弄懂后并有相應(yīng)的操作程序和安全保護(hù)措施。

(十)加強(qiáng)材消防管理,現(xiàn)場材料堆放整齊,易燃易爆易腐蝕物品應(yīng)妥善保管,遠(yuǎn)離火源,并留有合理的消防通道。

(十一)對施工班組人員在施工前,應(yīng)有安全技術(shù)交底,并監(jiān)督落實(shí)安全交底情況,嚴(yán)禁私接亂扯電線。

(十二)機(jī)械準(zhǔn)備

根據(jù)工程施工的特點(diǎn),要求施工機(jī)具配備如下:

序號

機(jī)具名稱

規(guī)格或型號

數(shù)量

單位

備注

1

電動套絲機(jī)

DN50-DN100

1

2

支流交流電焊機(jī)

20KVA

1

3

砂輪切割機(jī)

φ350

1

4

電動試壓泵

P=1.6mpaDN50

1

5

低壓變壓器

220V/36V

1

6

電錘

φ32型

1

7

沖擊電鉆

φ16型

1

8

重型套筒扳手

28件

1

9

水準(zhǔn)儀

1

10

萬能角尺

0-320度,精度2.

1

11

強(qiáng)力型管子鉗

1200,150mm

1

12

吊裝架

H=5.5m,自動

1

13

砂輪磨光機(jī)

φ100

1

14

游表卡尺

1/100×300

1

個(gè)

15

手動葫蘆

2t

1

16

手持式角向砂輪機(jī)

φ100

1

17

鋼絲繩

φ13×200m

1

18

氣焊工具

配瓶、表、割具

1

六、質(zhì)量保證措施

1.

施工前認(rèn)真熟悉圖紙,按照設(shè)計(jì)圖紙,工程洽商,施工規(guī)范,圖集及方案的要求明確做法。

2.

預(yù)留孔洞應(yīng)嚴(yán)格要求按照規(guī)范要求尺寸進(jìn)行,孔洞預(yù)留時(shí)應(yīng)與土建密切配合,派專人進(jìn)行看管,凡是需要剔鑿的孔洞應(yīng)在土建裝修前完成。剔洞尺寸及需要斷筋處應(yīng)先找土建工程師進(jìn)行協(xié)商經(jīng)土建工程師同意后方可進(jìn)行剔洞或斷筋,斷筋后應(yīng)嚴(yán)格按照規(guī)范要求進(jìn)行補(bǔ)救措施。

3.

每個(gè)分項(xiàng)工程施工前,工長應(yīng)組織班組人員根據(jù)圖紙及本方案有關(guān)要求結(jié)合施工現(xiàn)場實(shí)際情況進(jìn)行技術(shù)交底,一定要把好質(zhì)量標(biāo)準(zhǔn),施工方法及成品保護(hù)交代清楚,千萬不可盲目施工。

4.

各項(xiàng)技術(shù)資料應(yīng)及時(shí)辦理,手續(xù)應(yīng)齊全,不應(yīng)抄取文件資料應(yīng)按照工程施工進(jìn)度如實(shí)填寫,嚴(yán)格執(zhí)行規(guī)范規(guī)定,保證竣工時(shí)資料按時(shí)上報(bào)。

5.

堅(jiān)持按圖施工,沒有見到變更不得隨意更改圖紙,認(rèn)真按照工藝要求操作,對同類項(xiàng)目施工必須做樣板間、樣板項(xiàng),經(jīng)監(jiān)理及項(xiàng)目部驗(yàn)收合格后,方可進(jìn)行施工。

6.

操作者應(yīng)對質(zhì)量全面負(fù)責(zé),施工班組應(yīng)嚴(yán)格執(zhí)行三檢制,質(zhì)量檢查員一定要堅(jiān)持質(zhì)量評定標(biāo)準(zhǔn),不符合標(biāo)準(zhǔn)及規(guī)范要求的工程決不遷就,一定要把問題消滅在萌芽狀態(tài),確保工程質(zhì)量。

7.

施工班組在各種管道安裝前應(yīng)先了解設(shè)備尺寸,管道甩口,坐標(biāo),標(biāo)高,按照施工圖紙尺寸安裝后是否能夠滿足規(guī)范要求。各種設(shè)備及衛(wèi)生器具安裝完成后是否打架,是否影響使用功能,核對無誤后要及時(shí)進(jìn)行復(fù)查,凡超出偏差的及時(shí)修理,所有管道及設(shè)備敞口必須及時(shí)封堵,以免掉進(jìn)雜物。

8.

嚴(yán)格按照三檢制組織檢查各道工序的施工質(zhì)量。做到檢查上道工序,保證本道工序,服務(wù)下道工序。真正做到嚴(yán)格控制工序質(zhì)量,不合格的工序不移交。

9.

分項(xiàng)工程質(zhì)量評定標(biāo)準(zhǔn)應(yīng)進(jìn)行實(shí)事求是的原則,不得閉門造車。

10.

分項(xiàng)工程質(zhì)量應(yīng)先由各個(gè)班組自檢評定,自評合格后由項(xiàng)目部工長組織質(zhì)檢員及監(jiān)理核定質(zhì)量等級。

七、冬、雨季施工管理措施

1.

雪天施工應(yīng)把腳手架上積雪及時(shí)清理干凈再施工,并做好防滑措施。

2.

冬季施工管道的預(yù)留口應(yīng)及時(shí)封堵,防止雨雪進(jìn)入管內(nèi)凍壞管道,冬季施工不要把衛(wèi)生器具放在漏天處以免雨雪進(jìn)入衛(wèi)生器具凍壞造成不必要的經(jīng)濟(jì)損失。

3.

冬季焊接管道時(shí)應(yīng)有防風(fēng)措施,溫度低于負(fù)20度焊口應(yīng)該加熱,預(yù)熱溫度應(yīng)為100-200度,預(yù)熱時(shí)間為200-300min,室內(nèi)氣溫低于5度不應(yīng)該在做試水試驗(yàn);

4.

雨季施工時(shí)與室內(nèi)相通的管道及穿越外墻管道的孔洞應(yīng)及時(shí)封堵,防止泥漿灌入管道,雨水灌進(jìn)設(shè)備層。

5.

地下室的機(jī)電設(shè)備不宜過早安裝,以防地下室進(jìn)水淹泡設(shè)備或使各個(gè)器件受損,以進(jìn)場院未安裝的機(jī)械設(shè)備應(yīng)有防雨淋,防水措施

6.

電焊機(jī)及各種機(jī)械設(shè)備防雨措施應(yīng)齊全有效。電焊機(jī)的二次線也必須絕緣良好,焊接時(shí)應(yīng)雙線到位。焊接人員必須穿絕緣防護(hù)措施。

八、安全文明施工管理措施

1.

首先貫徹安全第一,預(yù)防為主的方針。明確安全生產(chǎn),消防安全的主要性。

2.

教育工人進(jìn)入施工現(xiàn)場必須戴安全帽,進(jìn)入現(xiàn)場嚴(yán)禁吸煙。

3.

每天應(yīng)該由專業(yè)工長在施工前根據(jù)當(dāng)天工作安排結(jié)合實(shí)際施工現(xiàn)場情況對工人進(jìn)行口頭安全和消防交底,并做好班前安全講話記錄。

4.

施工中一定要精神集中,不打鬧,每一項(xiàng)工作都應(yīng)該按照有關(guān)的安全操作規(guī)程去做,違反規(guī)定的適情節(jié)嚴(yán)重將給予經(jīng)濟(jì)處罰或開除。

5.

電、氣焊施焊前必須取得施工現(xiàn)場用火許可證,焊工必須持證上崗。違反其中任何一條規(guī)定者不準(zhǔn)施工。

6.

管道施焊前應(yīng)先把施工現(xiàn)場周圍的易燃易爆等危險(xiǎn)品清除干凈然后在進(jìn)行施工,焊接時(shí)應(yīng)該有專人攜帶消防水桶或其它消防設(shè)備看火。

7.

電焊機(jī)應(yīng)該放在防潮防雨的地方,移動電焊機(jī)時(shí)應(yīng)先拉閘斷電,每臺電焊機(jī)都應(yīng)有漏電保護(hù)裝置。電焊機(jī)一、二次接線端子應(yīng)有防護(hù)罩,電焊機(jī)與焊把線接觸應(yīng)緊密牢固,焊把線雙線到位中間不應(yīng)有接頭,無破損絕緣應(yīng)良好。

8.

施工現(xiàn)場使用電器設(shè)備時(shí)應(yīng)有專業(yè)電氣施工人員接線,其他任何人員都不準(zhǔn)私自亂接、亂拉,防止出現(xiàn)觸電事故。

9.

使用套絲機(jī)、砂輪機(jī)、切割機(jī)、電錘、手電鉆等電動工具時(shí)應(yīng)檢查工具的絕緣性是否良好,并使用有漏電保護(hù)裝置電源。使用電動旋轉(zhuǎn)工具不得戴手套。

10.

使用砂輪機(jī)時(shí)佩帶好護(hù)目鏡,砂輪機(jī)必須裝設(shè)不少于180度的防護(hù)罩和牢固的工作支架,嚴(yán)禁使用不圓、有裂紋和磨損剩余部分小于25㎜的砂輪。打磨物件時(shí)更不許使用切割機(jī)代替砂輪機(jī)使用。

11.

在設(shè)備層、衛(wèi)生間需要照明設(shè)備時(shí)必須使用36V低壓燈,在特別潮濕的場所及金屬容器內(nèi)工作的照明電壓不超過12V。

12.

使用易燃易爆的物品例如稀料、油漆、氧氣、乙炔氣應(yīng)放在工地單獨(dú)設(shè)立的庫房內(nèi)。

13.

教育工人使用電器設(shè)備使用完成后及時(shí)斷電,宿舍內(nèi)無人時(shí)使用的電器插頭應(yīng)拔掉。不要躺在床鋪上吸煙,施工現(xiàn)場嚴(yán)禁吸煙,吸煙時(shí)到項(xiàng)目部指定的吸煙室去吸。

14.

工長應(yīng)按分項(xiàng)工程作好安全和消防技術(shù)交底,與施工班組共同落實(shí)項(xiàng)目部具體安排的安全消防技術(shù)措施。

九、成品保護(hù)

1、工長應(yīng)對工程的成品保護(hù)全面負(fù)責(zé),負(fù)有直接責(zé)任,根據(jù)工程特點(diǎn)向施工班組做好成品保護(hù)交底。

2、工程材料進(jìn)場后各種管材、管件應(yīng)該碼在平整、無積水的場地上,下部應(yīng)用方木或木板墊好并應(yīng)該采取防雨措施。墊托的間距應(yīng)根據(jù)管子的材質(zhì)確定。

3、排水管道安裝調(diào)直后應(yīng)及時(shí)配合土建把孔洞堵好,堵洞時(shí)應(yīng)有專人看管,以免把管道擠歪。

5、安裝好的排水管的預(yù)留口及時(shí)封堵,綁扎結(jié)實(shí)。因施工現(xiàn)場人員多而雜所以對預(yù)留口應(yīng)多檢查,發(fā)現(xiàn)有脫落的及時(shí)補(bǔ)上。

6、安裝閥門時(shí)各種閥門的手輪先拆下來放在庫房內(nèi)在竣工前安裝。水表、水嘴等易丟失易損壞的物品也應(yīng)在竣工前安裝。

7、冬季施工盡量不做試水試驗(yàn),已經(jīng)做好過的試驗(yàn),如果房間不供暖在十月底之前必須把給水管道、排水管道、及衛(wèi)生器具的水清除干凈。

8、教育本班組施工人員即要保護(hù)自己的成品工程,也不要破壞他人的成品工程。保護(hù)建筑物內(nèi)的各個(gè)分項(xiàng)工程的成品人人有責(zé),全體施工及管理人員要提高成品保護(hù)意識,對有意識破壞他人勞動成果的進(jìn)行嚴(yán)厲處罰。

十、環(huán)保要求

1、施工現(xiàn)場的用水由排水施工班組負(fù)責(zé),施工現(xiàn)場應(yīng)注意節(jié)約用水,增加大家的節(jié)水意識。在用水量大和生活用水集中地區(qū)粘貼節(jié)約用水標(biāo)志。對工地的所有用水設(shè)備應(yīng)定期檢查發(fā)現(xiàn)問題及時(shí)解決。決不允許工地有常流水跑漏現(xiàn)象。

2、努力減少施工過程中產(chǎn)生的噪音,防止由此產(chǎn)生擾民及噪音污染。

3、施工現(xiàn)場的材料及使用工具應(yīng)碼放整齊,加以標(biāo)識。使用完后的管頭及費(fèi)料應(yīng)分類處理不要隨便亂扔,防止施工材料污染環(huán)境。

十一、技術(shù)節(jié)約措施

1、推廣應(yīng)用新材料,新技術(shù)、新工藝、提出合理化建議開展增產(chǎn)節(jié)約為中心的技術(shù)革新。

2、加強(qiáng)施工現(xiàn)場的材料管理,不同的材料應(yīng)有不同的管理措施。進(jìn)場的材料時(shí)間要把握好既不耽誤生產(chǎn)又不提前進(jìn)料,材料進(jìn)場應(yīng)在施工使用前三天為宜。進(jìn)場材料應(yīng)碼放整齊、妥善保管、定量發(fā)放,防止材料的變形和損壞。

3、施工中要堅(jiān)持大材不小用,長材不短用,優(yōu)材不略用活完腳下清。